My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 04/13/2023
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2023
>
Agenda - Parks and Recreation Commission - 04/13/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:36:47 AM
Creation date
4/7/2023 3:26:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
04/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'THE HOLLOW' - City of Ramsey Parks and Recreation <br />Preliminary Cost Estimate (first draft 25 August 2022) <br />Restroom Building <br />Prefabricated, delivered and installed <br />$ 75,000 <br />Boardwalk <br />Ramps 3001.f. @ $150/1.f. 45,000 <br />Landings 9 - 6' x 6' @ $1,000 each 9,000 <br />Bridge 1 - 6' x 12' @ $5,000 each 5,000 <br />Wood Stairs / Ladders 5,000 <br />Concrete <br />Walks and Plazas 2,500 s.f. @$10/s.f. 25,000 <br />Flat Curb at Sitting Circle 500 s.f. @ $10/s.f. 5,000 <br />Play Surface <br />Wood Fiber 12" depth 3,500 s.f. @ $4/s.f. 14,000 <br />Soft Trails <br />Crushed stone 6" depth 4,000 s.f. @ $3/s.f. 12,000 <br />Play Features <br />Combination of catalog pieces and on -site fabrication including <br />slides, net climbers, swings etc. 100,000 <br />Zip Line 18,000 <br />PVC Pipe (crawl-thru faux log tunnel) 2 @ $ 500 each installed 1,000 <br />Interactive Interpretive/Educational Panels 15,000 <br />Furniture (catalog selections) <br />6 Benches and 4 Picnic Tables 5,000 <br />Landscape Materials <br />New Trees, screen (hedge) and Prairie/Bee Lawn Seeding 10,000 <br />Park Lighting (ambient light from street lights and surrounding home sites) <br />Contingency <br />6,000 <br />TOTAL COST (preliminary estimate subject to further refinement) $ 350,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.