My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/11/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 04/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:11:41 AM
Creation date
4/7/2023 3:39:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anoka County Contract No. C0009284 <br />EXHIBIT <br />"C" <br />FOR PROJECTS CONSTRUCTED IN ANOKA COUNTY <br />ITEMS <br />COUNTY SHARE <br />CITY SHARE <br />Concrete Curb & Gutter <br />50% <br />50% <br />Concrete Curb & Gutter for Median and Center Island Construction <br />100% <br />0% <br />Concrete Median <br />100% <br />0*1 <br />Concrete Sidewalk <br />0% <br />100% <br />Concrete Sidewalk Replacement <br />100% <br />0% <br />Bikeways <br />0% <br />100% <br />Bikeway Replacement <br />100%, <br />0% <br />Construction or Adjustment of Local Utilities <br />Grading, Base and Bituminous <br />Storm Sewer <br />Driveway Upgrades <br />Traffic Signals, new (communities larger than 5,000) <br />w/ State Aid approved SJ R <br />Traffic Signals, replacement (communities larger than 5,000) <br />w/ State Aid approved SJ R <br />Unless existing trail not placed at edge of R/W <br />0% 100% <br />100% 0% <br />based on state aid letter*2 based on state aid letter*2 <br />100%, in -kind 100%, of up -grades <br />Traffic Signals, new & replacements (communities less than 5,000) <br />w/ State Aid approved SJ R <br />Traffic Signal, w/o State Aid approved SJR <br />EVP <br />Engineering Services <br />Right -of -Way <br />Street Lights <br />Noise Walls <br />%2 the cost of its the cost of its legs of <br />legs of the intersection the intersection plus'/2 <br />the cost of the County legs <br />of the intersection <br />the cost of its legs of the cost of its legs of <br />the intersection the intersection <br />100% 0% <br />0% <br />100% <br />0% <br />100% <br />*3 <br />*3 <br />100%*4 <br />0% <br />0% <br />100% <br />100%, if not previously notified*5 100%, if previously notified*5 <br />*1 The County pays for 100% of Standard Median Design such as plain concrete. If a local unit of government requests decorative <br />median such as brick, stamped concrete, or landscaping, the local unit will pay the additional cost above the cost of standard <br />median. <br />*2 In the event no State Aid is being used, or in the event the state aid letter does not determine cost split percentages, drainage cost <br />shares will be computed by the proportion of contributing flow outside the County right of way to the total contributing flow. <br />*3 Engineering shall be paid by the Lead Agency except that any participating agency will pay construction engineering in the amount <br />of 8% of the construction costs paid by that agency. <br />*4 In the event that the Township or City requests purchase of right-of-way in excess of those right-of-ways required by County <br />construction, the Township or City participates to the extent an agreement can be reached in these properties. For instance, a <br />Township or City may request a sidewalk be constructed alongside a County roadway which would require additional right-of-way, in <br />which case the Township or City may pay for that portion of the right-of-way. Acquisition of right-of-way for new alignments shall be <br />the responsibility of the Township or City in which the alignment is located. This provision may be waived by agreement with the <br />County Board if the roadway replaces an existing alignment and the local unit of government takes jurisdiction of that existing <br />alignment. In addition, any costs, including right-of-way costs, incurred by the County because a Township or City did not acquire <br />sufficient right-of-way during the platting process or redevelopment process as requested by the County shall be paid by the <br />Township or City. <br />*5 Notification includes any letter to the agency indicating that noise will potentially be an issue in the future, likely received during the <br />Plat Review Process. Maintenance shall be the responsibility of the agency paying for the initial installation. When the County is the <br />responsible agency, it shall pay 100% of Standard Noise Wall Cost. If a local agency requests decorative noise walls, the <br />requesting agency will pay the additional cost above the cost of standard noise wall. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.