Laserfiche WebLink
f\ilV,,,00k� <br />STREET RECONSTRUCTION <br />ASSESSMENT POLICY <br />Street Reconstruction. The City Council. has adopted a long-range plan providing for the <br />periodic reconstruction, including mill and overlay, of all paved city streets. With the <br />improvement of streets, as a result of reconstruction or mill and overlay, adjoining properties <br />receive special benefit that results in the increase of the property's value, It is the policy of <br />the City that this special benefit should be paid for by the property owner receiving the special <br />benefit rather than the City as a whole. This is accomplished by specially assessing the <br />benefited property as authorized by State Statute, Section 429. The following is the City of <br />Plymouth's policy regarding special assessments to properties benefiting from street <br />improvements. <br />a. It is the policy of the City to special assess abutting benefiting property for <br />street reconstruction costs, but not in excess of the special benefit to the <br />property. This policy applies to all streets that are public streets, <br />b. The assessment amount for the reconstruction or mill and overlay of previously <br />paved streets shall be determined annually by the City Council. <br />The assessment amount is based on the following; <br />(1)i In 2006 benefited properties shall be assessed 35% of the engineer's <br />estimated project cost as set forth in the project feasibility report or <br />35% of the actual project cost, whichever amount is less. In 2007 and <br />thereafter, the rate shall be 40%. <br />(2) For the purposes of street reconstruction or mill and overlay, the project <br />costs will include the cost of replacing or repairing concrete curb and <br />gutter, In those cases where bituminous curbing is replaced with <br />concrete curb and gutter, or where curb and gutter did not previously <br />exist, the additional special benefit will be assessed. The cost to be <br />assessed shall be 100% of the cost of installing the concrete curb and <br />gutter. This cost will be assessed on either a front foot or per lot basis. <br />The addition of a storm sewer system will also be considered an <br />additional benefit and shall be assessed at 100% of the cost. <br />(3) Proj ect cost includes both direct construction costs and all indirect costs <br />such as engineering and administration. <br />(4) Assessments shall normally be levied for a period not to exceed five (5) <br />years for assessments of $5,000 or less, ten (10) years for assessments <br />greater than. $5,000 but $10,000 or less, and Fifteen (15) yews for <br />assessments greater than $10,060. <br />ONb9MmrM,W11NaIWAA9MI31M451.191nelRaamrimilW Awnimnir,J'ropo,Wdm <br />13 <br />