Laserfiche WebLink
TO: City Administrator <br /> <br />FR[~: BUilding Official <br /> <br />~E: Monthly Report <br /> <br />DATE: September 17, 1980 <br /> <br />Housing continued to be slow with only six starts for the month and 32 <br />starts for the year. Almost all of ~Y time in the past month was spent in <br />building either with new construction or attempting to final miscellaneous <br />structures where the owners h~ve failed to call for inspections. There are <br />approximately one hundred of these cases and I have completed about thirty <br />and will continue to work on these as time allows. <br /> <br />Having missed several days due to illuess there is little else to report. <br /> <br />Permits issued, mileage and inspections are as follows: <br /> <br />Permits Issued <br /> <br />Permit Fee <br /> <br />A. Houses 6 <br />B. Comm/Ind. 0 <br />C. Garages 7 220.00 <br />D. Additions 4 98.00 <br />E. Swim. Pools I 40.00 <br />F. ~isc. 8 65.00 <br />G. Sewers 13 195.O0 <br />H. Plumbing 6 132.00 <br /> <br />Valuation Surcharge <br /> <br />$1,144.O0 $334,000.00 $167.00 <br /> <br />Totals 45 $1,894.00 <br /> <br />34,000.00 17.00 <br />14,000.00 7.00 <br />7,000.00 3.50 <br />65,000.00 4.00 <br /> <br />$395,500.00 $198.50 <br /> <br />Totals to date for 1980: <br /> <br />A. Houses 32 $5,980.00 <br />B. Comm/Ind. 6 1,247.O0 <br />C. Garages 34 986.00 <br />D. Additions 12 542.00 <br />E. Swim. Pools l0 364.00 <br />F. ~isc. 33 726.00 <br />G. Sewers 58 870.00 <br />H. Plumbing 38 802.00 <br /> <br />Totals 223 <br /> <br />$11,517.00 <br /> <br />$1,686,000.00 $843.00 <br />475,000.00 237.50 <br />151,000.00 75.50 <br />105,000.00 52.50 <br />61,000.00 30.50 <br />93,000.00 48.50 <br /> <br />$2,571,000.00 <br /> <br />$1,287.50 <br /> <br />~ileage 694 <br />Inspections 85 <br /> <br />CRB: sb <br /> <br /> <br />