My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/10/1981
Ramsey
>
Public
>
Agendas
>
Council
>
1981
>
Agenda - Council - 03/10/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 1:37:17 PM
Creation date
3/21/2006 9:09:18 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/10/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
potential flooding problems should be required to install driveway culverts. <br />This work is proposed to be done by the owner of the affected property. <br /> <br />Costs: <br />Estimated costs and estimated quantities for the proposed improvements are as <br /> <br />follows: <br /> <br /> ESTIMATED COSTS <br />STREET IMPROVEMENTS AS PETITIONED <br /> <br /> Item <br />Bituminous Surfacing <br />Class V Gravel <br />Shaping and Widening <br /> <br />15" Culverts and End Sections <br />Restoration Channel Cleaning <br /> <br /> and Culvert Cleaning <br /> <br />~ Est. Cost <br />2650 Ton $ 67,600 <br />4300 Ton 24,700 <br />Lump Sum 10,900 <br />Lump Sum 5,200 <br /> <br />Lump Sum <br /> <br />Estimated Construction Cost <br />Contingencies, Engineering & Administrative <br />Easements <br />ESTIMATED PROJECT COST <br /> <br />~0~500 <br />$118,900 <br />29,700 <br />2~500 <br />$151,100 <br /> <br /> ESTIMATED COSTS <br />ALTERNATE STREET IMPROVEMENT PROJECT INCLUDING <br />LIMONITE STREET AND 149TH AVENUE <br /> <br /> Ite~ <br />Bituminous Surfacing <br />Class V Gravel <br />Shaping and Widening <br />15" Culverts & End Sections <br />Restoration and Channel <br /> and Culvert Cleaning <br /> <br />3100 Ton <br />5675 Ton <br />Lump Sum <br />Lump Sum <br /> <br />Lump Sum <br /> <br />Estimated Construction Cost <br />Contingencies, Engineering & Administrative <br />Easements <br />ESTIMATED PROJECT COST <br /> <br />Est. Cost <br />$ 79,000 <br /> 32,600 <br /> 15,500 <br /> 6,400 <br /> <br />13~10q <br />$146,600 <br />36,650 <br />3~750 <br />$187,000 <br /> <br />4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.