My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/18/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 04/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:42:59 AM
Creation date
4/14/2023 3:42:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o 2023 construction proposed <br />. Highway 47 Sound Wall north of Xkimo Street (IP #22-17) <br />o MnDOT is preparing Cooperative Construction Agreement <br />o Staff anticipates requesting Council approval to authorize bids 04/25/23 <br />. WTP Trunk Watermain Improvements (#21-08) <br />. Staff anticipates requesting Council approval to amend SEH, Inc. agreement late April/early May to <br />revise plans and remove inspections <br />. Staff anticipates requesting council approval to authorize bids Fall 2023 <br />. Centralized Water Treatment Plant (#21-09) <br />. Council awarded contract for construction 03/28/23 <br />. Preconstruction meeting scheduled for 04/26/23 <br />. Substantial completion scheduled for 05/01/25 (Final 08/01/25) <br />. Ramsey Gateway Highway 10 Improvements (IP #20-11) <br />. Final design plans at 100-percent <br />. Open Houses held 04/12/23 <br />. Construction schedule; June 2023 through early 2026 (2024 - 2025 majority) <br />• Riverdale Drive east of SLB & temp US 10 widening Summer/Fa112023 <br />. Riverdale Drive Extension — Llama Street to Bowers Drive (IP #20-05) <br />. Construction substantially complete e Hwy 10 improvements still needed <br />. Wetland 114P Outlet Control Improvements (#19-07) <br />o Sanitary sewer manhole castings raised <br />o DNR Permit issued <br />o Grading & outlet control structure work to occur Spring/Summer 2023 <br />City of Anoka Improvement Projects <br />• Highway 47 Corridor Improvements <br />• Construction proposed for 2025 <br />• Anoka webpage https://clients.bolton-menk.com/anokahwy47/ <br />Anoka County Improvement Projects <br />. Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive (IP #23-03) <br />o City cost share = $28,667.64 per JPA <br />o Contract awarded <br />o Construction began late March <br />o Armstrong Boulevard will remain open to traffic at all times <br />o Alpine Drive will close to traffic either side of Armstrong Boulevard at different times <br />o Construction complete Fall 2023 <br />MnDOT Improvement Projects <br />. Anoka Solution Highway 10 Improvements <br />o Final completion Spring 2024 <br />o Anoka webpage https://clients.bolton-menk.com/hwy10/ <br />o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br />. US 10 / 169 & Ferry Street / TH 47 Interchange <br />o Final completion Spring 2024 <br />o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br />. Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design suspended to explore S-curve realignment <br />o $45M in bonds authorized October 2020 <br />o Construction proposed for 2024 or later <br />o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy47rr-anoka/ <br />. Rum River Bridge Replacement <br />
The URL can be used to link to this page
Your browser does not support the video tag.