Laserfiche WebLink
Procure and Plant 42 or 78 B & B Trees (Base Bid + Add Alternate), <br />with corresponding Design -build Irrigation System for Sunwood <br />Drive NW. <br />Base Bid $ <br />Add Alternate $ <br />Total Base and Alternate $ <br />In submitting the above quote, I/ We warrant the quote valid for work to be completed <br />in the Spring, Summer, or Fall of 2023 (Contractor's choice), or Spring of 2024. (Bidders <br />need only to submit this page, not the entire RFQ.) <br />Additionally, I/we acknowledge that the specifications and provisions above. <br />Contractor name <br />Owner or representative <br />Signature <br />Phone(s) <br />E-mail <br />111Page <br />