My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/25/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 04/25/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 5:02:01 PM
Creation date
4/24/2023 3:40:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/25/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
603
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TESTING SERVICES FEE SCHEDULE <br />RAMSEY WATER TREATMENT PLANT <br />14199 JASPAR STREET NW <br />RAMSEY, MN <br />AET PROPOSAL No. P-0021454 <br />SERVICE DESCRIPTION <br />Excavation Observations & Compaction Testing <br />Excavation Observations - Engineer I for observations of excavations, consultation and <br />reporting (assumes 6 trips to the jobsite). <br />Soil Density Testing - Technician II for soil compaction testing and reporting (assumes 12 trips <br />to the jobsite). <br />Trip Charge to the jobsite. <br />Nuclear Density Test <br />ASTM D698 Standard Proctor <br />ASTM C136 Sieve Analysis of Aggregate (Coarse and Fine) <br />AMERICAN <br />ENGINEERING TESTING <br />PROJECT BUDGET <br />ESTIMATED UNIT BUDGET <br />UNITS RATE AMOUNT <br />Subgrade/Base Proof Roll Observations & Testing <br />Proof Roll Observations - Engineer I for observations, consultation and reporting (assumes 1 <br />trip to the jobsite). <br />Trip charge to the jobsite. <br />Reinforcing Steel Observations & Concrete Testing <br />Reinforcing Steel & Concrete Testing - Technician II for observations of reinforcing steel and <br />testing of concrete (assumes 42 trips to the jobsite). <br />Trip Charge to the jobsite. <br />ASTM C39 Concrete Compressive Strength - Curing, handling and testing of 4" x 8" concrete <br />test cylinders (includes handling of non -tested cylinders). <br />Masonry Observations & Testing <br />Masonry & Grout Testing - Technician II for observations of masonry construction, sampling of <br />mortar and grout, consultation and report preparation (assumes 6 trips to the jobsite). <br />Trip Charge to the jobsite. <br />ASTM C1019 Sampling and Testing Grout - Curing, handling and compressive strength testing of <br />masonry grout test "prism" specimens (includes handling of non -tested specimens). <br />Sample Pickup - service from jobsite. <br />ASTM Masonry Prism Suite- C1314 and C140 Section 8 <br />ASTM Masonry Prism Suite- C1314 and C140 Sections 7 & 8 <br />Non -Destructive Testing (NDT) Observations <br />12 hours $146.00 $1,752.00 <br />28 hours $99.00 $2,772.00 <br />18 trips $80.00 $1,440.00 <br />40 tests $35.00 $1,400.00 <br />3 tests $160.00 $480.00 <br />3 tests $117.00 $351.00 <br />Section Subtotal: $8,195.00 <br />2 hours $146.00 <br />1 trips $80.00 <br />Section Subtotal: <br />84 hours <br />42 trips <br />$99.00 <br />$80.00 <br />168 cyls. $32.00 <br />Section Subtotal: <br />18 hours <br />6 trips <br />8 tests <br />2 trips <br />0 sets <br />$292.00 <br />$80.00 <br />$372.00 <br />$8,316.00 <br />$3,360.00 <br />$5,376.00 <br />$17,052.00 <br />$99.00 $1,782.00 <br />$80.00 $480.00 <br />$55.00 <br />$80.00 <br />$605.00 <br />0 sets $671.00 <br />Section Subtotal: <br />$440.00 <br />$160.00 <br />$0.00 <br />$0.00 <br />$2,862.00 <br />Structural Steel Observations - NDT Level II ICC/CWI Technician for observations of field <br />welded and bolted connections, consultation and report preparation (assumes 5 trips to the <br />jobsite). 20 hours $140.00 $2,800.00 <br />Trip Charge to the jobsite. 5 trips $80.00 $400.00 <br />Section Subtotal: $3,200.00 <br />Project Management & Coordination <br />Project Management - Engineer I/Project Manager for coordination of AET personnel and <br />activities, attending meetings (if requested), consultation and report preparation. <br />Project Administrator for report preparation, review, invoicing. <br />24 hours $146.00 <br />2 hours $75.00 <br />Section Subtotal: <br />$3,504.00 <br />$150.00 <br />$3,654.00 <br />ESTIMATED BUDGET $35,335.00 <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.