Laserfiche WebLink
161st Ave Reconstruct — CIP 23-01- Construction Staking <br />April 14, 2023 <br />Page2of2 <br />• No additional fees for stakes, mileage, equipment, etc. will be invoiced to the City, but are <br />included in our hourly rates. <br />• Additional services, if required, will be performed at the rates presented in the Proposed Fees <br />section of this proposal. <br />• In addition to the typical asbuilt items (such as hydrants, valves, manholes, catch basins), the <br />asbuilt survey allows for surveying newly installed curb stops. <br />PROPOSED FEES <br />Bolton & Menk proposes to perform the construction staking based on a not -to -exceed amount, based <br />on the rates presented in the following table: <br />Task and Personnel <br />Task 1: Construction Staking <br />Licensed Surveyor <br />Survey Technician <br />Survey Crew <br />Subtotals <br />Hours <br />9.0 <br />11.5 <br />125.0 <br />145.5 <br />Task 2: Asbuilt Survey <br />Licensed Surveyor 0.5 <br />Survey Technician 0.5 <br />Survey Crew 19.0 <br />Subtotals 20.0 <br />Grand Totals 165.5 <br />Rate/Hour Total <br />$188.00 <br />$153.00 <br />$181.00 <br />$188.00 <br />$153.00 <br />$181.00 <br />$ 1,692.00 <br />$ 1,840.00 <br />$22,625.00 <br />$26,157.00 <br />$ 94.00 <br />$ 80.00 <br />$ 3,439.00 <br />$ 3,613.00 <br />$29,770.00 <br />SCHEDULE <br />Due to our proximity to the site, we expect to be able to respond quickly to all construction staking <br />requests however 48-hour notice is requested to allow us to efficiently schedule survey crews. <br />If there are any questions, please call me at (651) 968-7760. <br />Sincerely, <br />BOLTON & MENK, INC. <br />.)592,1)------ <br />Kevin P. Kielb, P.E. <br />Principal Engineer <br />Bolton & Menk is an equal opportunity employer. <br />