My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/25/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 04/25/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 5:02:01 PM
Creation date
4/24/2023 3:40:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/25/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
603
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />April 18, 2023 <br />Joe Feriancek, P.E. <br />Assistant City Engineer <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />RE: Proposal for Construction Staking Services, City of Ramsey — IP 23-07 - 2023 Neighborhood <br />Pavement Overlay Improvements <br />Dear Mr. Feriancek: <br />We appreciate the opportunity to assist the City of Ramsey with construction staking for the above <br />referenced project. <br />SCOPE OF WORK <br />Bolton & Menk will provide staking for 21 pedestrian ramps. We will place a hub for the 'bottom of <br />ramp' zero locations and the top of ramp. <br />We understand the substantial completion date is June 30, 2023. We are anticipating the staking will <br />occur in late May / early June. <br />PROPOSED FEES <br />Bolton & Menk proposes to perform the construction staking based on a not -to -exceed amount, based <br />on the rates presented in the following table: <br />Task and Personnel <br />Task 1: Construction Staking <br />Licensed Surveyor <br />Survey Technician <br />Survey Crew <br />Subtotals <br />Hours <br />2.0 <br />3.0 <br />10.0 <br />15.0 <br />Rate/Hour Total <br />$376.00 <br />$160.00 <br />$181.00 <br />If there are any questions, please call me at (651) 968-7760. <br />Sincerely, <br />BOLTON & MENK, INC. <br />h AdZ391:11,2-' <br />Kevin P. Kielb, P.E. <br />Principal Engineer <br />$ 376.00 <br />$ 480.00 <br />$ 1,810.00 <br />$ 2,666.00 <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.