Laserfiche WebLink
~o~ ~t~e first time in the history of the Metropolitan Waste Control Commission, <br /> se bud eted. The actual expenditures of <br />~ctual expenditures exceeded tho . g. ~LA .~+ al expenditures of $49,218,?15 <br />$54,739,863 in 1980 are 11.2% oreater than ~.: a~u major categories <br />in 1979. The budgeted and actual expenditures are summarized by <br /> <br />as follows: <br /> 1980 1980 Actual Over <br /> u rZ <br /> Descriptio~ Bu_~dget Expenditures <br /> Wages & Benefits $16,579,543 $17,397,154 $ 817,611 <br /> Contracted Services 2,317,405 3,322,580 1,005,175 <br /> Insurance 1,157,265 801,335 (355,930) <br /> 9,416,714 690,784 <br /> Utilities 8,725,930 <br /> Chemicals 2,358,108 2,827,459 469,351 <br /> Acquisition & Debt 17,696,130 17,741,015. 44,885 <br /> Other 3__~,100,~24~ __3,233,60_~_6 __~133,364 <br /> Totals $~1,9~4,62~33 $54,739,$6~3 $2~,805,240 <br /> <br />The reason for actual expenditures exceeding those budgeted are as follows: <br /> enefits - it was necessary, due to the large expansion of the Metro <br /> Wage9 & Be~eT'. _ ~- ~lish reoional centers for controlling the work, as <br /> ~ant facilities, ~u :~ .... ~ <br /> it was physically impossible to the operators to cover the work area assioned. <br /> As there are 5 shifts (2 on weekends), it required a total complement of 60 <br /> personnel ( 5 x 12 ). ThiS is the reason the budget was exceeded. <br /> d services-sludge removal was budgeted~for a <br /> S vices - contracte ...... ~-~J +hat sludge would only <br /> Contracted ~r~e~. : ...... '-ina~Y oe~e,~,,-=~ ~- <br /> ~6,988 as ~ -:~ ~-~ 6 months of 1980. However, with <br /> have to be hauled to the farms the first <br /> the stricter air and water quality standards that were imposed on the Metro <br /> Plant, it. was necessary to not only haul sludge the whole year, but also in <br /> much greater quantities than anticipated causing a total expenditure of <br /> $1,151,787 or $774,799 more than budgeted. Contracted Services-Other: <br /> was also over budget due to the hiring of consultants for the water quality <br /> standards hearings which is also why the budget for Contracted Services-Legal <br /> was exceeded.. <br /> Utilities - whereas $.54 a gallon was originally budgeted for fuel oil, the <br /> gallon was $.80. Even thouoh we received twice the an~unt <br /> ~st per ....... ~-(nallv expected-and ~hi~h.is signifi?ntly <br /> of natural gas w~lcn wu u..~- ~ --A" +~e budoet oue to the increased <br /> lower in cost, our utility costs exceuu:u -,, ~ <br /> cost of fuel oil. · sts exceeded budget by $469,351 because one <br /> r~m~mals - actual che~ca~ c~ .... ~ -~t completed in 1980 as originally <br /> ~c~nstruction pro3ects o~o nu~ ~ ' use. <br /> thought, which would have caused a reduction ~n <br /> Os~p~ther - the actual costs exceeding budget by $133,364 is due to materials & <br /> les that were necessary to be purchased in 198Q for repairs unanticipated- <br /> <br /> <br />