My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/28/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 03/28/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:01:16 PM
Creation date
3/24/2006 2:21:46 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/28/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
60 South Sixth Street, Suite 2450 <br /> MinneApolis. MN 55402 <br /> Tel 612~656-7(]00 <br /> Fax 612/656-7001 <br /> <br />3D/I <br /> <br /> To <br /> <br /> From <br /> <br />Copy To <br /> <br />Date <br /> <br /> Re <br /> <br />MEMORANDUM <br /> <br />Bill Aho <br /> <br />H&S Drywall, [nc. <br /> <br />Cheryl Badinger 3DFi <br /> <br />Jim Way <br />Heidi Nelson <br />Ted Redmond <br />Steve Schmidgall <br />Tim Quinlan <br /> <br />City of Ramsey <br />City of Ramscy <br />BKV Group <br />BKV Group <br />3D/I <br /> <br />December 8, 2005 <br /> <br />Ramsey Municipal Center <br />Reflective Ceiling Area C <br /> <br />We are in receipt ofH&S Drywall's memo dated November 28, 2005 <br />regarding the clearstory ceiling in Area C. H&S's has stated RCP AS.lC <br />does not indicate this area to be a drywall ceiling. <br /> <br />I have reviewed H&S's memo with Ted Redmond and Steve Schmidgall, <br />both of BKV Group. The construction documents indicate the clearstory <br />ceiling in Area C to be a Level 5 gypboard ceiling. This area has notations <br />indicating.such. The following is a list of the sheets, details, and notations <br />indicating the gypboard ceiling: <br /> <br />I. Sheet A0.1 <br /> a. References section I/A4.2 and 4/A4.2 <br /> <br />2. Section 1/A4.2 <br /> a. References section 4/A4.2 <br /> b. References detail 7A/71 <br /> i. Notation states "see Dot 7B/71 (rev) for balance of <br /> notes". <br /> ii. Detail 7B/71 states "see RCP for ceiling finish" <br /> c. The clearstory ceiling area indicates a ceiling below the <br /> beams by the use of heavy lines. The clearstory space <br /> includes the area above the roll call and office located <br /> between grids T and R. <br /> <br />Section 4/A4.2 <br /> a. References section I/A4.2 <br /> b. References detail 3/A5.5 <br /> i. References detail 8B/71 <br /> ' ' 1. Eave detail <br /> ii. The clearstory ceiling area indicates a ceiling below <br /> the curved beams by the use of heavy lines. The <br /> <br />-150- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.