Laserfiche WebLink
July 13, 1984 <br /> <br />PAI~IAL PAY BSTII~TI~ <br /> <br />Honorable Mayor and City Council <br />City of R~sey <br />15153 Nowthen Boulevard N.W. <br />R~sey, Minnesota 55303 <br /> <br />Re: <br /> <br />Street Improvement Project 84-2&11 <br />Contractor: Hardrives, Inc. <br />Bid Amount: $55,646.00 <br />Award Date: June 15, 1984 <br />Completion Date: August 20, 1984 <br /> <br />Dear Council Members: <br /> <br />The following work has been completed on the above referenced project by <br />Hardrives, Inc. <br /> <br />BID SCHEDULE 1.000 - <br />STREET IMPROVEMENT PROJf~ST 84-2 ROLLING GREEN ADOITION <br /> <br /> Estimated Used To <br /> Item Quantity Date Unit Price Extension <br />1. Grading (Road Stations) 43 RS 43 RS $85.00/RS $3,655.00 <br />2. Bituminous Material for <br /> Mixture 72 T 58.08 T $200.00/T $11,616.00 <br />3. Bit~inous Surfacing 1,200 T 1,037.18 T $10.80/T $11,201.54 <br />4. Bituminous Driveway <br /> Pave~aent 40 SY -0- $8.00/SY -0- <br />5. Aggregate Base Class V 1,800 T 1,723.53 T $5.10/T $8,790.00 <br />6. 15" (~4P 24 LF 24 LF $18.00/LF $432.00 <br />7. 15" G~P 2 EA 2 EA $90.00/EA $180.00 <br />8. RipRap 5 CY -0- $50.00/CY -0- <br /> <br />TOTAL BID SCHEDULE 1.000 - <br /> <br />BID SCHEDULE 2.000 <br />STREET IMPROV~ENT PROJfL'T 84-11 MA(INESIUM STREET <br /> <br /> Estimated Used To <br />Item Quantity Date Unit Price <br />1. Co~n Excavation 300 CY 300 CY $5.50/CY <br />2. C~,L~n Borrow 350 CY 300 CY $3.70/CY <br />3. Bituminous Material for <br /> Mixture 14 T -0- <br />4. Bit~m~inous Surfacing 240 T -0- <br />5. Bituminous Driveway <br /> Pavement 40 SY -0- <br />6. Aggregate Base Class V 180 T 170 T <br />7. 11" x 18" C~P 68 LF 68 <br />8. 11" x 18" C~4P Aprons 4 EA 4 <br />9. sod 500 SY -0- <br />lg. Seeding 500 SY -0- <br />11. RipRap 6 CY -0- <br />12. Bituminous Repairs 20 SY -0- <br />13. Clearing & Grubbing 3 Trees 3 Trees <br /> TOTALBID SCHfI)ULE 2.000 - <br /> <br />$35,874.54 <br /> <br />Extension <br /> <br />$1,650.00 <br />$1,110.00 <br /> <br />$200.00/T -0- <br />$10.80/T -0- <br /> <br />$8.00/SY -0- <br />$6.00/T $1,020.00 <br />$19.00/LF $1,292.00 <br />$110.00/EA $440.00 <br />$2.00/SY -0- <br />$2.00/SY -0- <br />$50. g0/CY -~- <br />$10.00/SY -0- <br />$100.00/Tree $300.00 <br /> <br />$5,812.00 <br /> <br /> <br />