My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/16/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 05/16/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:43:14 AM
Creation date
5/12/2023 3:58:08 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• WTP Trunk Watermain Improvements (#21-08) <br />• Staff anticipates requesting Council approval to amend SEH, Inc. agreement to revise plans and <br />remove inspections June 13, 2023 <br />• Staff anticipates requesting Council approval of plans and authorization to re -bid Fall 2023 <br />• Centralized Water Treatment Plant (#21-09) <br />• Preconstruction meeting conducted April 26, 2023 <br />• Construction will begin June 2023 <br />• Substantial completion scheduled for May 1, 2025 <br />• Final completion scheduled for August 1, 2025 <br />• Ramsey Gateway Highway 10 Improvements (IP #20-11) <br />• Final design plans at 100-percent <br />• Construction schedule; June 2023 through early 2026 (2024 - 2025 majority) <br />• Riverdale Drive east of SLB & temp US 10 widening Summer/Fa11 2023 <br />• Riverdale Drive Extension — Llama Street to Bowers Drive (IP #20-05) <br />• Construction substantially complete e Hwy 10 improvements in progress <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />• Sanitary sewer manhole castings raised <br />• DNR Permit issued <br />• Grading & outlet control structure work to occur Spring/Summer 2023 <br />City of Anoka Improvement Projects <br />• Highway 47 Corridor Improvements <br />• Construction proposed for 2025 <br />• Anoka webpage https://clients.bolton-menk.com/anokahwv47/ <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive (IP #23-03) <br />• City cost share = $28,667.64 per JPA <br />• Construction began late March <br />• Armstrong Boulevard will remain open to traffic at all times <br />• Alpine Drive will close to traffic either side of Armstrong Boulevard at different times <br />• Construction complete Fall 2023 <br />MnDOT Improvement Projects <br />• Anoka Solution Highway 10 Improvements <br />• Substantial completion November 2023 <br />• Final completion Spring 2024 <br />• Anoka webpage https://clients.bolton-menk.com/hwv10/ <br />• MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwv10-anoka/ <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />• Final completion Spring 2024 <br />• MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwv10-anoka/ <br />• Ferry Street / Trunk Highway 47 Grade Separation C BNSF Rail Crossing <br />• Preliminary design suspended to explore S-curve realignment <br />• $45M in bonds authorized October 2020 <br />• Construction proposed for 2024 or later <br />• MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy47rr-anoka/ <br />• Rum River Bridge Replacement <br />• Three lanes each direction <br />• Final completion Spring 2024 <br />• MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwv10-anoka/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.