Laserfiche WebLink
m <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />i 16. <br /> 17. <br /> <br />I <br />I <br />I <br /> 25.* <br /> <br />I 26.* <br /> 27.* <br /> <br />Honorable Chairman a~d Board Members <br />City of Ramsey <br />15153 Nowthen Boulevard N.W. <br />Ramsey, Minnesota 55303 <br /> <br />November 16, 19~ <br /> <br />River's Bend - Trunk San. Sew. & Lateral San. Sew. & Watermain <br />Contractor: ArconConstruction Company, Inc. <br />Bid Amount: $846,163.75 <br />Award Date: September 26, 1984 <br />Co{npletion Date: May 10, 1985 <br /> <br />Dear Board Members: <br /> <br />The following work has been completed on the above referenced project by Arcon Construction <br />Company, Inc. <br /> <br />S~HfI)ULE "A" - TRUNK SANITARY S~ER (Improvement Project 84-12) <br /> <br /> Used to <br />Item Depth Estimated Quantity Date Unit Pcice Extension <br /> <br /> 1. 30" R.C.P. Class V 20-22' 650 Linear Feet IF $68.60 <br /> 2. 30" R.C.P. Class V 22-24' 750 Linear Feet IF $68.60 <br /> 3. 12' PVC Pipe 10-12' 15 Linear Feet IF $33.95 <br /> 4. 12" PVC Pipe 12-14' 105 Linear Feet 80 LF $33.95 <br /> 5. 12" PVC Pipe 14-16' 850 Linear Feet 845 IF $35.40 <br /> 6. 12" ~ Pipe 16-18' 360 Linear Feet 322 IF $35.40 <br /> 7. 12" PVC Pipe 18-20' 410 Linear Feet 193 IF $37.35 <br /> 8. 12" PVC Pipe 20-22' 530 Linear Feet 75 IF $37.35 <br /> 9. 12" D.I.P. 14-16' 80 Linear Feet 70 IF $44.40 <br />10. Jacking Under S.T.H. 147 varies 65 Linear Feet 65 IF $115.00 <br />11. Standard Manhole 16 Each 9 FA $850.00 <br />12. Special Manhole (60" Dia.) 1 Each EA $1,800.00 <br />13. Extra Depth of Manhole <br /> (Over 10') 150 Linear Feet 55 LF $48.00 <br /> Connect to M.W.C.C. Sewer 1 Lump Sum LS $100.00 <br /> Drop Structure 6 Each* 4 FA $750.00 <br /> Riser Pipe for Drop <br /> Structure 40 Linear Feet* 33 LF $40.00 <br /> 4" Service Connection <br /> (12# Wye) 13 Each 4 FA $50.00 <br />18. 4" Service Pipe 630 Linear Feet* 40 LF $9.20 <br />19. ~ccding 8 Acres AC $195.00 <br />20. Pipe Testing 3815 Linear Feet IF $0.20 <br />21. Crushed ~ock for Bedding 1000 Ton T $0.01 <br />22. Fertilizer 2Ten T $325.00 <br />23. Mulch 12 Ten T $105.00 <br />24.* Double 6" Service <br /> Connection 2 Each FA $195.00 <br /> Single 6" Service <br /> Connection 9 Each FA $175.00 <br /> 4" Service Connection <br /> (30" NiP) 2 Each FA $150.00 <br /> 6# Service Pipe 500 Linear Feet IF $10.20 <br /> <br />TO~AL SCHEDULE "A": <br /> <br />/IF $0.0: <br />/IF $0.0~ <br />/tS $0.0~ <br />/IF $2,716.0 <br />/LF $29,913.O <br />/LF $11,398.8 <br />/LF $7,208.5 <br />/LF $2,801.2 <br />/LF $3,108.0 <br />~ $7,475.0: <br />'EA $7,650.0 <br />~ $0.0 <br /> <br />/LF $2,640.0 <br />/LS $0.0 <br />/FA $3,000.0 <br /> <br />/LF $1,320.0 <br /> <br />/FA $200.0 <br />/LF $368.0 <br />/AC $0.0 <br />/LF $0.0 <br />/T $0.0 <br />/T $0.0 <br />/T $0.0 <br /> <br />/FA $ 0.0 <br /> $0.0 <br />/FA $0.0 <br /> $0.0 <br />/FA $o. o <br />/LF $0.0 <br /> <br />$79,798.6 <br /> <br />*Per Change Order No. 2 <br /> <br /> <br />