Laserfiche WebLink
Capital Improvement Program <br />City. of Ramsey, Minnesota <br /> <br />2006 thru 2010 <br /> <br />?roll=t# 06-PARK-013 <br />?roject Name Peltzer Park Connections <br /> <br />Type Improvement <br />Useful-Life 20 Years <br /> <br /> Priority ma <br /> <br /> ] Total Project Cost $25,000 <br /> Description ~ <br />Extending the access trail to the play equipment - around the cul de sac easterly to right-of-way on 148th lane. <br /> <br />The second connection, further to the east, would require acquisition of part of the lot presentlYo?anaged by M?CA. <br />This would allow for street, and/or trail connections from 148th to the cul de sac of Garnet Street. <br /> <br />Justification <br /> <br />Two important trail opportunities ex/st relative to Peltzer Park. The first is immediately available, and consists of <br />extending the access trail to the play equipment - around the cuI de sac easterly to right-of-way on I48th lane. This <br />>rovides resident of Regency Ponds more of a direct access to the park. <br /> <br />the second connection, furthen to the east, would require acquisition of part of the lot presently managed, by MPCA. <br />This would allow for street, andTor trail connections from 148th to the'cul de sac of Garnet Street, and thereby improve <br />access to both Peltzer and Alpine Parks - as well as provide a circuitous walking loop within these neighborhoods. (See <br />also Savanna Trail bridge.) <br /> <br />Modest slsna~e and improved landscape at Peltzer would be a benefit as well. <br /> <br />Expenditures 2006 2007 2008 2009 2010 Total <br /> ~c 0 25,0~0 <br /> <br />Funding Sources 2006 2007 2008 2009 2010 Total <br />Park lml:>rovement Trust FunO 25,000 25,000 <br /> Total 21000 25.000 <br /> <br /> Rev~aed / 0/05 <br />42: <br /> <br /> <br />