Laserfiche WebLink
October 28, 2003 <br />Page 2 of 2 <br /> <br />Curb and Gutter - For the purposes of street reconstruction, the project costs will include the cost of <br />replacing or repairing concrete curb and gutter. Concrete curb and gutter is required unless the average lot <br />frontage is greater than 150 feet. In those cases where new concrete curb and gutter is installed, an <br />additional special benefit will be assessed. The cost to be assessed shall be the cost of installing the new <br />concrete curb and gutter and assessed on a front foot basis. The addition of a wider street or a storm sewer <br />system may also be considered an additional special benefit and may be assessed. <br /> <br />Utilities - Reconstruction upgrades and repairs to existing water, sanitary sewer, and storm sewer are not <br />assessed and are paid by relative utility fund/fees as considered maintenance and upkeep/upgrade item. <br />Brand new and non replacement utilities are 100% assessed. <br /> <br />Driveways - Match repair/replacement paid under roadway reconstruction funding. <br /> <br />Street Lights - Installation of street lights will be 100% assessed and possible only if petitioned by <br />neighborhood. <br /> <br />New Sidewalk. - No assessment if determined needed by City. <br /> <br />Seal Coats and Overlays - Part of pavement management program and not assessed if determined needed by <br />City. <br /> <br />Senior Citizen and Disabled People Special Assessment Deferrals: <br /> <br />If you are at least 62 years of age or disabled, you may qualify to have special assessments deferred if they create a <br />hardship for you. <br /> <br />Adopted by City Council on October 28, 2003 by Resolution 10-28-03-08 <br /> <br />-294- <br /> <br /> <br />