Laserfiche WebLink
CC Regular Session <br />Meeting Date: 05/09/2023 <br />By: Chris Anderson, Community Development <br />Title <br />• <br />. <br />Information <br />5.9. <br />Adopt Resolution #23-076 Approving a Site Plan and Stormwater Management Agreement for a Proposed <br />Building Expansion by Soderholm & Associates at 7150 143rd Avenue NW (Project No. 23-100); Case of <br />Soderholm & Associates <br />Purpose/Background: <br />The City has received an application from Soderholm & Associates (the "Applicant") for a proposed <br />expansion of their existing facility located at 7150 143rd Avenue NW (the "Subject Property"). The proposed <br />building expansion and associated improvements appear to meet all minimum standards. If not for the size of <br />the proposed expansion as it relates to the existing building footprint, this would have qualified for an <br />Administrative Site Plan review (meaning the Applicant could have proceeded directly to an application for a <br />Building Permit rather than Site Plan review). The Planning Commission reviewed the Site Plan at their <br />regular meeting on April 27, 2023. <br />Notification: <br />Site Plan review does not require a public hearing. However, Staff did attempt to notify property owners <br />within 350 feet of the Subject Property, via standard U.S. mail, of the proposed building expansion and of the <br />Planning Commission meeting date and time. <br />Observations/Alternatives: <br />Project Summary <br />The Subject Property is located south of 143rd Avenue, between Ramsey Boulevard and Limonite <br />Street. The Applicant's existing building is approximately 14,560 square feet in size and has ten (10) striped <br />parking spaces. The Applicant is proposing an expansion of approximately 43,000 square feet along with <br />sixty-nine (69) additional parking stalls. As part of this project, the Applicant will be abandoning the septic <br />system and connecting to both sanitary sewer and municipal water. The project will also provide on -site <br />stormwater management, including both infiltration and retention, in various locations across the Subject <br />Property. <br />Zoning and Land Use <br />The Subject Property is zoned E-2 Employment and is guided as Business Park in the Comprehensive <br />Plan. Manufacturing, warehousing, and offices are permitted uses in this zoning district. <br />Building Coverage and Architecture <br />The proposed addition will result in a building footprint of 57,543 square feet. The total building coverage <br />on the Subject Property will be approximately thirty-four percent (34%), well under the maximum allowable <br />building coverage of forty-five percent (45%). The exterior finish of the proposed addition will consist of <br />precast concrete walls with exposed aggregate panels at the top and random ribs and score lines below. It <br />also includes some prefinished vertical seam metal siding as an accent. The building height is approximately <br />twenty-five (25) feet, well below the sixty-five (65) feet that is allowed in this zoning district. <br />Access, Parking, and Maneuverability <br />The Subject Property currently has a single access off of 143rd Avenue. The proposed improvements include <br />two (2) additional access points, both off of Limonite Street. The new accesses would be for shipping and <br />receiving, as well as for additional employee parking. All proposed parking and maneuvering areas meet the <br />twenty (20) foot setback from rights -of -way. There are currently ten (10) striped parking stalls on site. The <br />