My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/23/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 05/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2025 3:59:44 PM
Creation date
5/25/2023 11:39:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/23/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 5. 15. <br />Meeting Date: 05/23/2023 <br />Submitted For: Joe Feriancek, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />Information <br />Title <br />Adopt Resolution #23-118 Approving Change Order #1 for Improvement Project #23-07, 2023 Neighborhood <br />Pavement Overlay Improvements <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #23 -118 approving Change Order #1 for Improvement Project <br />#23-07, 2023 Neighborhood Pavement Overlay Improvements. <br />Background: <br />The bituminous pavement on the segment of Alpine Drive between State Highway 47 and Roanoke Street is <br />rapidly deteriorating, resulting in unsafe driving conditions for the public. Improvement Project #23-07 originally <br />included overlaying the pavement on the segments of Xkimo and Yakima Streets north of Alpine Drive. On April <br />25, 2023, the City Council approved adding a 2-inch mill and overlay improvement to various areas of Alpine <br />Drive between Yakima Street and Roanoke Street. Since then, Staff have had more time to evaluate the condition <br />of the segment of Alpine Drive between Yakima Street and Roanoke Street, and have held conversations with the <br />contractor that was awarded the construction contract for Improvement Project #23-07. As a result of these <br />conversations, Staff requests approval to amend the plans to complete a 1 1/2-inch mill and overlay of all of the <br />drive lanes on Alpine Drive between the west side of its intersection with Yakima Street to the east side of its <br />intersection with Roanoke Street, in lieu of completing 2-inch spot mill and overlay improvements. This will <br />better hold the entire segment of Alpine Drive together until it can be reconstruction in 2030 per the current <br />l0year Capital Improvement Program, and will prevent Public Works Staff from needing to patch potholes on <br />this segment of Alpine Drive every year until then. <br />A revised plan sheet and engineer's estimate for the change order is attached to this case. <br />Notification: <br />No notification is required with this case. <br />Observations/Alternatives: <br />Motion to adopt Resolution #23-118 approving Change Order #1 for Improvement Project #23-07, 2023 <br />Neighborhood Pavement Overlay Improvements. <br />Funding Source: <br />Funding for the Alpine Drive mill and overlay, including Change Order #1, is proposed to come from budgeted <br />2023 Temporary Pavement Repair Funds. Change Order #1 increases the Alpine Drive mill and overlay estimated <br />project costs by $20,307.05 per bid unit prices. An engineers estimate for Change Order #1 is attached to this case. <br />Recommendation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.