My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/23/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 05/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2025 3:59:44 PM
Creation date
5/25/2023 11:39:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/23/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IP 23-14 2023 CRITICAL MILL AND OVERLAY IMPROVEMENTS <br />STATEMENT OF ESTIMATED QUANTITIES <br />Item MnDOT Note Item Description Unit Quantity <br />No. No. <br />1 2021.501 MOBILIZATION LS 1 <br />2 2232.504 1,5 MILL BITUMINOUS PAVEMENT (2.0") SY 15778 <br />3 2357.506 2,5 BITUMINOUS MATERIAL FOR TACK COAT GAL 1104 <br />4 2360.509 3,5 TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) 2.0" TON 1783 <br />5 2563.601 4 TRAFFIC CONTROL LS 1 <br />PAY ITEM NOTES: <br />1. REMOVAL LIMITS SHALL BE MARKED IN THE FIELD BY CITY STAFF. <br />2. ESTIMATED QUANTITY BASED ON APPLICATION RATE OF 0.07 GAL/SY. <br />3. ESTIMATED QUANTITY BASED ON APPLICATION RATE OF 113 LB/SY-IN. <br />4. LUMP SUM QUANTITY SHALL INCLUDE ALL COST REQUIRED FOR <br />MAINTAINING ALL FLAGGING OPERATIONS AS NECESSARY, MAINTAINING <br />PEDESTRIAN ACCESS ROUTES, ANY SIGNAGE AND BARRICADES AS <br />NECESSARY. <br />5. QUANTITIES REFLECT A 5% OVERHEAD TO ACCOUNT FOR POTHOLE FILL <br />AND FIELD ADJUSTMENTS. <br />GENERAL NOTES: <br />1. SOME MILLING AREAS CONTAIN POTHOLES GREATER THAN 2" IN DEPTH. <br />ALL MILL AREAS SHALL USE A 2" MILL, BUT WHERE THE DEPTH IS GREATER <br />THAN 2" TO FILL WITH BITUMINOUS PAVEMENT, THE HOLES WILL FIRST BE <br />FILLED WITH ADDITIONAL BITUMINOUS MATERIAL AND THEN COMPACTED <br />PRIOR TO PLACING 2" LIFT. <br />2023 INTERSECTION MILL & OVERLAY <br />STATEMENT OF ESTIMATED QUANTITIES <br />
The URL can be used to link to this page
Your browser does not support the video tag.