My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/23/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 05/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2025 3:59:44 PM
Creation date
5/25/2023 11:39:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/23/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Fees Payable to the City <br />1. Trail Development Fees. The PERMITTEE is responsible for satisfying applicable Trail <br />Development Fee requirements. PERMITTEE must pay a Trail Development Fee of $75,000.00 <br />(50 units x $1,500.00 per unit). The PERMITTEE acknowledges that these fees are estimates. The <br />rate in effect when the Plat is recorded will be collected. <br />2. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br />applicable Sanitary Sewer Trunk Fee requirements. PERMITTEE must pay a Sanitary Sewer <br />Trunk Fee of $67,450.00 (50 units x $1,349.00). The PERMITTEE acknowledges that these fees <br />are estimates. The rate in effect when the Plat is recorded will be collected. <br />3. Water Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying applicable Water <br />Trunk Fee requirements. PERMITTEE must pay a Water Trunk Fee of $100,450.00 (50 units x <br />$2,009.00 per unit). The PERMITTEE acknowledges that these fees are estimates. The rate in <br />effect when the Plat is recorded will be collected. <br />4. Stormwater Management Fee. The PERMITTEE is responsible for satisfying applicable <br />Stormwater Trunk Fee requirements. PERMITTEE must pay a Stormwater Management Fee <br />of $26,700.00 (50 units x $534.00 per unit). The PERMITTEE acknowledges that these fees are <br />estimates. The rate in effect when the Plat is recorded will be collected. <br />►rai; Development <br />Residentail 50 31,500 $75 000 <br />Subtotal Park [i n d Trail DeveIopmerat S75, 000 <br />Water and Sewer Fees <br />,,,'ater, -runk (Connection) <br />Sanitary Sewer er Trunk (Connection) <br />'] �e$Z009 $100,450 <br />50 $1,349 $67,450 <br />Subtotal Hater rind Sewer Fees $167,900 <br />Stormwater Management Fees <br />Stormwater 50] per unit $534 $26. I00 <br />Subtotal Stnrniwriter Man (WPM Nit 526,100 <br />GRAND TOTAL FOR DEVELOPMENT FEES S269,600 <br />5. Street Sign Fee. While the CITY provides and installs the street name and traffic control signage, <br />the PERMITTEE is responsible for paying for them at a rate of $245 per sign. PERMITTEE <br />must pay a Street Sign Fee of $2,695.00 ($245 x 4 street name signs; $245x 4 no parking signs; <br />$245 x 3 stop signs). <br />6. Development Fees for the Outlots. The PERMITTEE acknowledges that development fees are <br />not being collected for any Outlots. The PERMITTEE acknowledges that development fees will <br />be due upon development of any of the Outlots. The rate in effect at the time said future plat(s) <br />is recorded will be collected. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.