My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/25/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 04/25/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:02:28 PM
Creation date
4/21/2006 2:37:46 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/25/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R/verside Manufacturing-Site Plan Review <br />March 28, 2006 <br />Revised April 21, 2006 <br />Page 3 of 4 <br /> <br />evergreens and shrubs. While the overall number of trees exceeds the minimum required, <br />at least one additional ever~een species, such as balsam fir or wkite spruce, should be <br />added to the planting schedule to reduce the number of green spruces installed. <br />Additionally, Staffwould like to see at least a couple additional shrub species included in <br />the planting schedule. It should be noted that the number of proposed shrubs (144) far <br />exceeds the number of required shrubs (100) and so there is some ability to reduce the <br />total number installed while also increasing species diversity. <br /> <br />All areas not otherwise improved must be sodded. Any alternative to sod requires <br />Council approval. <br /> <br /> All landscaping requires an underground irrigation system. Irrigation metering and <br /> backflow devices shall be approved as part of the Utility Plan, and installed accordingly. <br /> Irrigation rain sensors shall be installed and appropriately placed throughout the <br /> development. <br /> <br />A revised Landscape Plan should be submitted. <br /> <br />Tree Preservation: A tree preservation plan has been submitted, and is being reviewed <br />by City Staff. Further comments, if any, will follow regarding the Tree Preservation Plan. <br />Drainage and Grading: A two-sheet set of grading, drainage and erosion control plans <br />dated March 3, 2006, and revised March 24, 2006 has been prepared by Tim Eggerich, <br />PE Mr this site. The following comments are offered: <br /> · Construction of the parking lot facility has been extended to the north line of the <br /> property. Permission must be obtained from the adjacent landowner to facilitate <br /> any construction activity beyond the site borders. <br /> · An 18 inch storm sewer is proposed to be installed in a 20 foot strip between the <br /> proposed building and the south property line. This storm sewer would be <br /> problematic to maintain in this confined location. It is suggested that the storm <br /> sewer be redirected to be combined with the storm sewer north of the proposed <br /> building. <br /> <br /> · This site plan will be required ti) obtain a permit from the Lower Rum Rivei' <br /> Water Management Organization. <br /> <br />Easements: According to the legal description, the lot to be developed has a 33 foot <br />private road easement across the northern boundary of the site. The City will forego this <br />easement, as current property owners, but will request that a 20 foot wide drainage and <br />utility easement be dedicated on the northern boundary to allow access to the City <br />drainage pond on the western portion of the site. The legal description for the property <br />will be rewritten to reflect the new easement. Please show this proposed 20 foot easement <br />across the north boundary of the property.. In addition to the 20 feet easement for access, <br /> <br />-224- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.