My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/25/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 04/25/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:02:28 PM
Creation date
4/21/2006 2:37:46 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/25/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
("Stage I Improvements") <br /> <br />The DEVELOPER agrees to construct the Stage I Improvements according to the terms and <br />conditions of this agreement and in accordance with DEVELOPER'S plans submitted to the <br />CITY: Utility Plans; Sanitary Sewer and Watermaln Construction; Storm Sewer and Street <br />Construction; Grading, Erosion Control and Details, dated April 6, 2006, revised <br /> , prepared by Passe Engineering. The final construction plan for <br />the Stage I Improvements shall be submitted to the City Engineer for review and approval <br />prior to commencement of construction. <br /> <br />The DEVELOPER shall be responsible for completing the rough grading and providing lot <br />comer stakes prior to the installation of underground utilities. All permanent lot comers shall <br />be in place prior to the release of the Stage I financial guarantee. <br /> <br />5. Stage I Improvements Completion Date. The Stage I Improvements shall be completed on <br /> or before May 1, 2007. <br /> <br />Sta~e I Improvement Financial Guarantee. The DEVELOPER shall provide a financial <br />guarantee to the CITY guaranteeing the construction of the Stage I Impr~m~.,n[s and.~?i~ <br />timely completion. The financial guarantee shall be in the amount of:' :~ ::~: ~:'7~.' Dollars and <br />nq.. cents ($XX.00} (125% x SXX.00), which amount is 125% of the City Engineer's <br />estimated cost of the Stage I Improvements. The financial guarantee required by this <br />paragraph shall be in the form of cash or a letter of credit, approved as to form by the CITY. <br />The financial guarantee shall be deposited with the CITY at the time of execution of this <br />agreement. Upon total completion of Stage I Improvements (including the removal of <br />"temporary" erosion control measures as identified in the approved Grading Plan), <br />acceptance by the CITY, supported by appropriate lien waivers, the DEVELOPER may <br />request a reduction in the amount of the financial guarantee, but only if the maintenance <br />guarantee required by Paragraph 8 below has been deposited. <br /> <br />Inspection Fees. The DEVELOPER shall be responsible for all inspection costs incurred <br />by the City related to the installation of Stage I Improvements. The DEVELOPER shall <br />make a cash deposit into the appropriate escrow account at the City and the City shall have <br />the authority to draw upon these funds for the purpose of compensating for inspection <br />services. The amount of the deposit shall be equal to five percent (5%) of the estimated cost <br />of the Stage I Improvements or Dollars and no cents ($3LX~00).'(_5%:X SXX~00). <br /> <br />Brookfield Second Addition <br />Development Agreement <br />Page 3 of ll <br /> <br />-273- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.