Laserfiche WebLink
g) <br /> <br />disposal by fire must also manage air quality impact and smoke nuisance to adjoining <br />property owners as well as fire safety concerns. <br /> <br />Whole trees may not be disposed of by burning. Trunks and limbs larger than six (6) <br />inches in diameter must be salvaged for lumber, firewood, chipped or hauled to a <br />licensed wood disposal site. Application may be made for an open burning permit to <br />dispose of brush less than six (6) inches in diameter and stumps with less than four <br />feet of main trunks attached. The location of the proposed open burn site will be <br />specified by the CITY. Wood disposal by burning requires whole tree volume <br />reduction, proposed site inspection prior to clearing and an open burning permit. <br />Residual ash and unburned stumpage may be buried on the site at the approval of the <br />CITY. Chipped material may be applied and utilized on site to mitigate root damage <br />from grade changes or used in the right-of-way for erosion control and top soil <br />restoration. <br /> <br />SECTION VI <br />GENERAL <br /> <br />21. Mailbox Locations. The DEVELOPER herein agrees to cluster the mailboxes where <br /> possible; placement of mailboxes along public streets is subject to the approval of the CITY. <br /> Utility locates will be necessary. <br /> <br />22. Boulevard and Area Restoration. The DEVELOPER shall be responsible for the cost of <br /> establishing seed in all boulevards within thirty (30) days of the completion of the street <br /> im~_ovements, and restoring all other areas disturbed by the development grading operation <br /> in accordance with the approved Grading and Erosion Control plan. The DEVELOPER <br /> shall also be responsible for the cost of cleaning any soil, earth or debris from the wetlands <br /> within and adjacent to tiffs Plat resulting from grading performed in the development of the <br /> land. <br /> <br />23. Construction Site Maintenance. The DEVELOPER shall adhere to all City ordinances <br /> relating to, but not limited to, dumping of garbage, site development, construction debris, <br /> open burning, etc. Construction and Delivery Hours are restricted to 7:00 AM to I0:00 PM, <br /> Monday through Saturday. The DEVELOPER shall post a sign stating such at all entrances <br /> to the DEVELOPMENT, such sign may range from 20 to 30 square feet in size, and be <br /> securely anchored in place. <br /> <br />24. Estimated Cost. It is understood and agreed that cost mounts set forth in this Agreement as <br /> Stage I and Stage II Improvements, unless specified as fixed amounts, are estimated. The <br /> DEVELOPER agrees to pay the entire cost of said improvements including interest, <br /> engineering and legal charges. <br /> <br /> 25. Plat Approval Expenses. The DEVELOPER agrees that it will pay to the CITY all CITY <br /> expenses incurred in the approval of the Plat, including, but not limited to administration <br /> expenses, engineering and legal fees. Said expenses 'shall be paid within fifteen (15) days of <br /> Brookfield Second Adch'tion <br /> Development Agreement <br /> Page 9 ofll <br /> <br />-279- <br /> <br /> <br />