My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/13/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 06/13/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:19:11 AM
Creation date
6/13/2023 10:46:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/13/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
638
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 5.15. <br />Meeting Date: 06/ 13/2023 <br />Submitted For: Joe Feriancek, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />Information <br />Title <br />Adopt Resolution #23-130 Accepting Proposals for Topographic Surveys for 2024 Pavement Management <br />Program Projects <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #23-130 accepting proposals for topographic surveys for 2024 <br />pavement management program projects. <br />Background: <br />On March 28, 2023 the Ramsey City Council adopted Resolution #23-062, ordering Staff to request proposals for <br />topographic surveys for 2024 Pavement Management Program (PMP) projects. In addition to 2024 PMP projects, <br />City Council discussion included adding Fox Ridge Estates 1st and 2nd Street Reconstruction to the list of projects <br />to receive proposals. Fox Ridge Estates 1 st and 2nd is proposed in the current 2023 — 2032 Capital Improvement <br />Program (CIP) as a 2025 street reconstruction. Obtaining topographic surveys does not move the improvement up <br />to 2024, but will allow City Staff to begin working on plans and specifications once 2024 improvement designs <br />are complete. Because of the size of the Fox Ridge Estates 1st and 2nd subdivision, receiving the topographic <br />survey in the fall of 2023 is appropriate to allow Staff an early start on design, which would otherwise wait until <br />late spring of 2024. <br />Staff will use the materials as design aids for the improvement projects. Topographic surveys are essential to <br />locate all existing site features and to create an existing ground surface, used as the base for designing the project. <br />Project Bolton & Menk, Inc. <br />IP 24-01; Barthel's Rum River Acres & <br />TS$51346.00 <br />White Pines Estates Street Reconstructions <br />IP 24-02; Halls Dover Acres Street <br />Reconstructions $3,892.00 <br />IP 24-11; MSA Alpine Drive (Puma St / <br />CSAH 83) Reconstruction <br />IP 24-12; Juniper Woods 1st — 3 rd Street <br />Reconstructions <br />IP 24-13 Fox Ridge Estates 1st & 2nd <br />Street Reconstructions <br />$3,020.00 <br />$3,164.00 <br />$7,660.00 <br />Total Amount for all Projects �$23, 082.00 <br />Hakanson Anderson <br />$5,950.00 <br />$4,700.00 <br />6. <br />$31850.00 <br />6. <br />$3,550.00 <br />6. <br />$9,500.00 <br />$27,550.00 <br />Bolton & Menk submitted the lowest responsible quotes. Based on the submitted quotes, Staff recommends <br />accepting the proposals for all five topographic surveys from Bolton & Menk. <br />Bolton & Menk is required to complete their work between July 14 and September 1, 2023, based upon the <br />schedule in the Request for Proposal. <br />Notification: <br />
The URL can be used to link to this page
Your browser does not support the video tag.