Laserfiche WebLink
i. Urban residential subdivision with generally clear ROW area <br />1. 32-foot wide urban section streets <br />2. Municipal utilities exist within the subdivision <br />5. IP 24-13 Fox Ridge Estates Street Reconstructions <br />a. Right of Way is generally 66-feet wide <br />i. Right of Way topo areas is 17.73 acres <br />b. Streets are approximately 2.13 miles in total length <br />i. Urban residential subdivision with generally clear ROW area <br />1. 32-foot wide urban section streets with bituminous curbing <br />2. Storm sewer, no water or sanitary sewer <br />3. Additional 20' wide drainage easement area off Sodium Street cul- <br />de-sac <br />6. The scope of these surveys each include: <br />a. Topographic Survey <br />b. Contacting Gopher State One Call to locate utility markings <br />c. Delivery of survey points in an Excel/CSV format <br />d. Point Code listing <br />FIELD SURVEY REQUIREMENTS: The field survey is not limited to, but is expected to <br />include the following: <br />• Elevations along the centerline, edge of bituminous pavement, top and bottom of swale, <br />and boulevard up to the right-of-way at 50-foot stations and grade changes <br />o Urban section areas shall include flowline and top back of curb shots <br />• Location and elevations on driveway edges and corners to the right-of-way <br />• Location and elevations of any storm sewer, sanitary sewer, watermain, utilities, structures, <br />etc. within the survey area <br />o Gopher One State locate calls shall be made prior to surveying <br />• Locations and elevations of trees/tree lines, landscaping, mailboxes, signage, fence lines, <br />etc. within the survey area <br />• General top and bottom of slopes, and intermediate spot elevations in swales <br />SCHEDULE: A written schedule of the work shall be submitted identifying all work components <br />and showing work start and completion dates required to comply with the schedule. Once work <br />has commenced, the Contractor shall continuously pursue completion in accordance with the <br />approved schedule. The final Topographic Survey must be delivered to the City by the date listed <br />in the attached proposal sheet. <br />PROPOSAL SUBMITTAL: A lump sum quote for each project shall be submitted for the <br />proposed work using the form at the end of this Request for Proposal (RFP). <br />COMMUNICATION WITH THE CITY: If any requirements of this RFP are not clearly <br />understood, the Contractor is responsible for contacting the City for further clarification in a <br />3 <br />