Laserfiche WebLink
Mr. Bruce Westby, P.E. <br />April 7, 2023 <br />Page 2of5 <br />• The construction of the regional storm water retention pond will allow for complete <br />development of The COR. This construction will then allow for construction of The Waterfront <br />amenity, and <br />• The material generated from the regional storm water retention pond can be used as fill for the <br />remaining undeveloped portion of The COR. This should serve to lower development costs, <br />making the area more attractive to potential businesses. <br />CONSTRUCTION COST ESTIMATES <br />The COR report update, completed in 2023, presented project costs associated with the street and <br />public utility related improvements. Those amounts were based on 2023 construction costs, and <br />included a 30 percent allowance for contingencies and project development. Project costs were also <br />included in The COR report for the regional storm water retention pond, mass grading, tree <br />preservation, and park amenities. <br />Based on The COR analysis, the following construction cost estimates, including a 10% contingency, <br />were considered when preparing our fee estimate: <br />Ramsey <br />Zeolite <br />Center <br />Improvement <br />Parkway <br />Street <br />Street <br />TOTAL <br />Roadway <br />$1,2591100 <br />$709,100 <br />$555,900 <br />$2,524,100 <br />Parking <br />$0 <br />$0 <br />$15 8,400 <br />$15 8,400 <br />Trails/Sidewalks <br />$249,600 <br />$199,700 <br />$1661700 <br />$6161000 <br />Storm Sewer <br />$6751200 <br />$1131400 <br />$1451500 <br />$9341100 <br />Trunk Storm Sewer <br />$221000 <br />$681500 <br />$0 <br />$901500 <br />Watermain <br />$3541500 <br />$2331500 <br />$0 <br />$5881000 <br />Sanitary Sewer <br />$1701100 <br />$1517500 <br />$0 <br />$3211600 <br />Trunk Sanitary Sewer <br />$248,800 <br />$0 <br />$0 <br />$248,800 <br />Total Costs <br />$299799300 <br />$194759700 <br />$190269500 <br />$594819500 <br />Construction costs associated with the regional storm water retention pond include the following: <br />dewatering, muck excavation, wetland mitigation, clay liner, and rough grading of the storm water pond <br />area. Additionally, material will be placed on adjacent lots within The COR area and compacted to allow <br />for building pads. Construction costs associated with these items are estimated at $5,066,800. <br />Tree removal and preservation construction costs are estimated at $135,400 within the regional pond <br />area and at $671,800 for the remaining areas. <br />Total estimated construction costs for the described improvements are estimated at $11,355,500. <br />SCOPE OF SERVICES <br />PRELIMINARY DESIGN <br />Prior to initiating design, we will meet with the City to discuss the initial project scope. Items to discuss <br />include: <br />• Topographic Survey of The COR, <br />• Geotechnical and Environment Evaluations, <br />C:\Users\kevinki\Desktop\COR Design 2023\New folder\Ramsey COR Area Design 04072023.docx <br />Bolton & Menk is an equal. opportunity employer. <br />