Laserfiche WebLink
Bolton & Menk, Inc. <br />Proposal QTB175606 <br />April 4, 2023 <br />Page 7 <br />If the proposed Scope of Services cannot be completed according to this schedule due to circumstances <br />beyond control, we will notify and discuss with you the revised schedule. <br />Geotechnical Scope <br />We anticipate performing our work according to the following schedule. <br />■ Drill rig mobilization — within about 5 to 6 weeks following receipt of written authorization <br />■ Field exploration —11 drilling days on site to complete the geotechnical borings <br />■ Classification and laboratory testing — within 1 week after completion of field exploration <br />■ Preliminary results — as samples are obtained and reviewed <br />■ Draft report submittal — within about 4 weeks of after completion of field exploration <br />■ Final report submittal — within 5 days of receiving comments on the draft report and <br />depending on the complexity of the comments <br />If we cannot complete our proposed scope of services according to this schedule due to circumstances <br />beyond our control, we may need to revise this proposal prior to completing the remaining tasks. <br />Fees <br />The costs for each of the tasks described in this proposal are as follows. <br />Service Description <br />Task 1 — Phase I Environmental Site Assessment <br />Cost <br />Professional Services <br />$ 31000 <br />Phase 1 ESA Estimated Subtotal <br />$ 3,000 <br />Task 2 — Geotechnical Evaluation <br />Site Layout — Staking — Utility Coordination <br />$ 21950 <br />Drilling Services <br />49,500 <br />Geotechnical Laboratory Testing <br />61025 <br />Engineering & Reporting <br />121200 <br />Geotechnical Evaluation Estimated Subtotal <br />$70,675 <br />Estimated Project Total <br />$73,675 <br />BRAUN <br />I NTE RTEC <br />