Laserfiche WebLink
06/15/2023 12:29 PM <br />GRADING.pdf V2 - Changemark Notes (5 Notes ) <br />1 - Watermain Storm Crossing <br />Status as of 06/09/2023 01:34 PM <br />Type: Action <br />State: For Discussion <br />Created by: Logan Czech <br />O n : 06/09/2023 01:34 PM <br />Type: Action <br />State: For Discussion <br />This storm and water crossing looks like it will be similar in elevation, provide min 18" separation <br />and insulate if less than 24" <br />2 - Flow direction <br />0 Replies <br />Status as of 06/09/2023 01:55 PM <br />Type: Action <br />State: For Discussion <br />Created by: Logan Czech <br />O n : 06/09/2023 01:55 PM <br />Type: Action <br />State: For Discussion <br />There are no arrows indicating flow direction in this area. After this first phase is constructed will <br />water in this paved area make it to the catch basin to the West? <br />3 - 24" RCP Inlet <br />0 Replies <br />Status as of 06/09/2023 02:01 PM <br />Type: Action <br />State: For Discussion <br />Created by: Logan Czech <br />O n : 06/09/2023 02:01 PM <br />Type: Action <br />State: For Discussion <br />This run does not need all joints tied, just last three joints is plenty. <br />4 - 24" RCP Outlet <br />0 Replies <br />Status as of 06/09/2023 02:02 PM <br />Type: Action <br />State: For Discussion <br />Created by: Logan Czech <br />O n : 06/09/2023 02:02 PM <br />Type: Action <br />Page 1 <br />