My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/20/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 06/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:43:28 AM
Creation date
6/16/2023 12:05:11 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: 04/25/2023 <br />Submitted For: Joe Feriancek, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />Information <br />5. 11. <br />Title <br />Adopt Resolution #23-083 Amending Scope of Improvement Project #23-06, 2023 MSA Pavement Overlay <br />Improvements <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #23-083 amending the scope of Improvement Project #23-06, <br />2023 MSA Pavement Overlay Improvements to include the streets within the Rivenwick 3rd and Rivenwick <br />Village subdivisions. <br />Background: <br />On December 13, 2022, the Ramsey City Council ordered the City Engineer to prepare plans and specifications <br />for Improvement Project #23-06, 2023 MSA Pavement Overlay Improvements. This project proposes to mill and <br />overlay 0.61 miles of Riverdale Drive between Ramsey Boulevard and Feldspar Street. <br />In March of 2023, Staff received concerns from residents about the condition of 139th Lane and Jaspar Street, a <br />loop road off of Riverdale Drive west of Feldspar Street. Staff followed up on the concerns with a site visit and <br />noted significant pavement stripping is occurring on the streets within the Rivenwick 3d an Rivenwick Village <br />subdivisions. A street segment summary and pictures of the pavement conditions are attached to this case for <br />reference. <br />The current 2023 through 2032 10-year Capital Improvement Program (CIP) proposes pavement mill and overlay <br />improvement for Rivenwick 3'd and Rivenwick Village in 2025. Staff proposes to move the improvements up to <br />2023 and to include as part of the 2023 MSA Pavement Overlay Improvements for the following reasons: <br />• Pavement stripping allows the bituminous to be exposed to further damage. If not treated, the pavement <br />conditions may worsen to the point where a mill and overlay is no longer the suitable treatment. <br />• By including this as a 2023 improvement, it frees up resources to patch other areas of the City during 2023 <br />and likely 2024. Typically, once pavement stripping occurs, it will migrate to adjacent pavement. <br />• Because the subdivisions are immediately adjacent to Riverdale Drive, already proposed to be milled and <br />overlaid, additional mobilization costs are avoided. <br />• The 2023 Neighborhood Pavement Overlay Improvements has already been bid, with bids opened April 21, <br />2023. Adding these subdivisions to the 2023 MSA Pavement Overlay Improvements project avoids delays <br />in starting or a change or to the 2023 Neighborhood Overlay Improvements. The 2023 Neighborhood <br />Overlays are proposed to be substantially complete by June 30, 2023. <br />• The CIP proposes funding these improvements from Pavement Management Funds in 2025. The same <br />funds would be used, just moved up to 2023. <br />Proposed Schedule: <br />• May 23, 2023 <br />• May 26; June 2, 2023 <br />• June 19, 2023 <br />• June 27, 2023 <br />• July 10, 2023 <br />• Sep 1, 2023 <br />City Council approve plans & authorize advertisement for bids <br />Advertisement for bids <br />Bid opening <br />City Council award contract to lowest responsible bidder <br />Approximate start of construction <br />Substantial Completion <br />
The URL can be used to link to this page
Your browser does not support the video tag.