My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/20/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 06/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:43:28 AM
Creation date
6/16/2023 12:05:11 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Centralized Water Treatment Plant (#21-09) <br />• Construction in progress <br />• Substantial completion scheduled for May 1, 2025 <br />• Final completion scheduled for August 1, 2025 <br />• Ramsey Gateway Highway 10 Improvements (IP #20-11) <br />• Construction schedule; June 2023 through early 2026 (2024 - 2025 majority) <br />• Riverdale Drive east of SLB & temp US 10 widening Summer/Fa112023 <br />• Riverdale Drive Extension — Llama Street to Bowers Drive (IP #20-05) <br />• Construction is complete <br />• Punch list work in progress <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />• Construction is complete <br />• Punch list work in progress <br />City of Anoka Improvement Projects <br />• Highway 47 Corridor Improvements <br />• 3-lane design proposed south of Bunker Lake Boulevard <br />• City just received regional solicitation funds for 2027 construction <br />• Signal system at McKinley Street is proposed to be permanent <br />• Anoka webpage https://clients.bolton-menk.com/anokahwy47/ <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive (IP #23-03) <br />• Construction in progress <br />• Armstrong Boulevard will remain open to traffic at all times <br />• Alpine Drive is closed to traffic either side of Armstrong Boulevard. <br />• Construction complete Fall 2023 <br />MnDOT Improvement Projects <br />• Anoka Solution Highway 10 Improvements <br />• Substantial completion November 2023 <br />• Final completion Spring 2024 <br />• Anoka webpage https://clients.bolton-menk.com/hwy10/ <br />• MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />• Final completion Spring 2024 <br />• MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />• Preliminary design suspended; exploring S-curve realignment and stormwater impacts <br />• $45M in bonds authorized October 2020 <br />• Construction proposed for 2024 or later <br />• MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy47rr-anoka/ <br />• Rum River Bridge Replacement <br />• Three lanes each direction <br />• Final completion Spring 2024 <br />• MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br />Studies & Items of Interest <br />• Sunfish Lake Sedimentation Basin Improvements <br />• Property owner indicated interest in filling swale and grading sedimentation basin <br />• Staff delineated rear property line last Fall and notified property owner <br />• Staff continues working to contact property owner <br />