Laserfiche WebLink
Untitled Document file:///w:/Untitled- 1.htm <br /> <br />Upon the selection of preferred alternatives at each location, future plans include further design continued right-of-way preservation <br />and acquisition activities, and environmental reviews- provided funds are available. <br /> <br />The work underway in Ramsey fits into a larger vision for the THI0 corridor. Up and coming projects along THI0 include <br />construction of the Hanson Boulevard intemhange, similar access improvement planning efforts through Anoka and further study of <br />the potential Northwest River Crossing. These projects are all critical to the overall safety and mobility of the corridor as well as part <br />ora regional system. <br /> <br />Contact dodi Ruehle, The Tinklenberg Group at 763- 783-1288 or via E-mail at [odiruehle~tinklenber,ggroup. com with any <br />questions or comments. <br /> <br />3 of 3 4/28/2006 9:02 AM <br /> <br /> <br />