My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 06/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:20:14 AM
Creation date
6/26/2023 9:13:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION: The City of Ramsey (City) is requesting proposals for the delivery of five (5) <br />geotechnical reports for 2024 projects including; <br />1. IP 24-01 Barthel's Rum River Acres & White Pine Estates Street Reconstruction <br />• Subdivision is generally located along 164th Lane, between TH 47 and the Rum River. <br />Additionally, the Helium Street cul-de-sac is located south of 169th Avenue and is included <br />with this project and shown on the soil boring location map <br />a. Streets are approximately 1.3 7 miles in total length <br />i. 24-feet wide <br />11. Speed limit is 30 mph <br />b. Scope of work includes: <br />1. 17 soil borings to a depth of 10-feet per the attached exhibit <br />1. Seventeen (17) Pavement Cores <br />11. A standard geotechnical report including construction feasibility for public <br />utilities and pavement section <br />M. Logs of soil borings with descriptions of nomenclature used for defining the <br />site soils <br />iv. Estimated subgrade support strength parameters for design of the <br />bituminous roadway and recommendations for soil corrections <br />v. Recommendations for earthwork associated with installation of storm sewer <br />vi. Recommendations for management of groundwater for design of structures <br />and pavements <br />2. IP 24-02 Halls Dover Acres Street Reconstruction <br />• Subdivision is located generally Northeast of Nowthen Blvd (CSAH 5) and 157th Lane. <br />a. Streets are approximately 0.98 miles in total length <br />i. 24-feet wide, rural section <br />ii. Speed limit is 30 mph <br />b. Scope of work includes: <br />i. 15 soil borings to a depth of 15-feet per the attached exhibit <br />1. Fifteen (15) Pavement Cores <br />ii. A standard geotechnical report including construction feasibility for public <br />utilities and pavement section <br />M. Logs of soil borings with descriptions of nomenclature used for defining the <br />site soils <br />iv. Estimated subgrade support strength parameters for design of the <br />bituminous roadway and recommendations for soil corrections <br />v. Recommendations for earthwork associated with installation of storm <br />sewer, sanitary sewer and watermain <br />vi. Recommendations for management of groundwater for design of structures <br />and pavements <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.