Laserfiche WebLink
5 . IP 24-13 Fox Ridge Estates 1" & 2nd Street Reconstruction <br />• Subdivision is generally located west of TH 47 between 170th Avenue and 174th Avenue, <br />west to Wolfram Street. <br />a. Streets are approximately 2.11 miles in total length <br />i. 30-feet wide, rural section with bituminous curb <br />ii. Speed limit is 30 mph <br />b. Scope of work includes: <br />i. 26 soil borings to a depth of 10-feet per the attached exhibit <br />1. Twenty -Six (26) Pavement Cores <br />ii. A standard geotechnical report including construction feasibility for public <br />utilities and pavement section <br />iii. Logs of soil borings with descriptions of nomenclature used for defining the <br />site soils <br />iv. Estimated subgrade support strength parameters for design of the <br />bituminous roadway and recommendations for soil corrections <br />v. Recommendations for earthwork associated with installation of storm sewer <br />vi. Recommendations for management of groundwater for design of structures <br />and pavements <br />SOIL BORING REQUIREMENTS: Soil borings to a depth called out above will be taken at <br />stationing shown on the attached "Boring Hole Location" exhibits. Soil borings will alternate <br />between drive lanes as practical. Cores of the existing bituminous pavement will be required. Cores <br />will be taken to verify thickness and structural integrity of the existing pavement and base. Pictures <br />of the cores will be included in the final report. Any additional depth beyond depth called out will <br />be paid per lineal foot. The Contractor must perform sufficient survey work to locate holes <br />approximately 5 feet horizontally and approximately 0.5 feet vertically. The Contractor is <br />responsible for locating all utilities prior to starting boring operations. <br />SOIL BORING LOG REQUIREMENTS: A field boring log will be prepared by the Contractor <br />for each boring with a copy included in the final report. The field boring logs will include; <br />• The project identification number <br />• Location of the boring referenced by centerline stationing <br />• Boring log number <br />• Method of drilling and sampling, diameter of bore hole <br />• Date, name of driller and crew <br />• Ground surface elevation and ground water elevation measured to the nearest 0.5 feet <br />• Definition of all symbols that are not otherwise self-explanatory <br />• Classification, thickness, color, moisture condition (dry, moist, wet, saturated), <br />composition and degree of compactness <br />• Field number of any samples taken, type of sample and depth taken <br />• Depth at which obstacles were encountered in advancing the boring <br />• Any other unusual conditions encountered during drilling and sampling <br />11 <br />