My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 06/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:20:14 AM
Creation date
6/26/2023 9:13:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OBOLTON <br />Real People. Real Solutions. <br />June 22, 2023 <br />Mr. Bruce Westby, P.E. <br />City Engineer/ Director of Public Works <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, M'N 55303-5119 <br />RE: Proposal for Construction Related Services —167t" Avenue Reconstruction Project <br />City Project No. 23-04 <br />Dear Mr. Westby: <br />Ph: (7631 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />We appreciate the opportunity to present this scope of services for the 167t" Avenue Reconstruction <br />Project. Our scope and fees were prepared based on our understanding of the project and our previous <br />experience in assisting the City of Ramsey with similar project types. Our proposed services will be as <br />described below: <br />Contract Preparation —Assist with Notice of Award, Contracts, and Notice to Proceed. Prepare sets of <br />contract documents (plans and specifications) for City and Contractor. <br />Pre -Construction Conference —Attend Pre -Construction Conference to address questions that may arise <br />related to project design or construction staking. <br />Shop Drawing /Submittal Review— Review submittals for key project components. <br />Construction Staking —Includes the following: <br />• Staking Calculations and Preparation of Data, <br />• Establishing Survey Control, <br />• Staking of Erosion Control, <br />• Staking of Storm Sewer, <br />• Staking Right -of -Way, <br />• Staking Drainage Ditch Grading, <br />• Staking Curblines for Grading and also for Final Curb & Gutter Construction, <br />• Staking Blue Tops for Subgrade and Class 5 Aggregate Base Course, and <br />• Staking Pavement Markings. <br />Pay Application Assistance — Work with City and Contractor to complete payment documents. <br />As -Built Survey and Record Drawings — Survey key project components after completion of construction <br />and prepare of Record Drawings. <br />Construction Revisions and Plan Updates —To be performed as needed during construction. We have <br />assumed a total of 48 hours for this task. <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.