My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/08/1988
Ramsey
>
Public
>
Agendas
>
Council
>
1988
>
Agenda - Council - 03/08/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 12:20:57 PM
Creation date
5/4/2006 2:31:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/08/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P~st 1~ r f ormance <br />The vendor should state past performance that would enable the panel to <br />determine the extent and depth of their e;.~erience to install equipment and to <br />service the t%~e of telephone ss~stems indicated. <br /> <br />Examples of Similar Projects <br />Provide, if possible, names of contact people who can arrange for the panel to <br />view an operating system similar to the vendor's proposed system. These <br />systems should be in the Twin Cities area. <br /> <br />Credentials of Firm <br />Attach any information that will help the panel to determine the suitability <br />of the vendor to supply services to the City of P~msey (include information on <br />the equipment supplier if different than vendor). <br /> <br />Qualifications of Personnel <br />State the size of staff, the number of people trained in the installation and <br />maintenance of the equipment, and the ts~pe of training that each is required <br />to have to perform their job. <br /> <br />Proposed Installation Schedule <br />State whether installation and maintenance of the proposed system will be <br />accomplished by staff or subcontractor. List all detaLls and requirements as <br />well as a maxim~ time for system installation after award of the contract. <br /> <br />Training <br />Include what training is available for <br /> Console operator(s) <br /> Individual phone users <br /> <br />Proposal for Present and Future Operation R~quirements <br />The panel %~i!1 evaluate the proposal based on the proposer's success in <br />meeting the present and future needs of the telephone system requirements of <br />the City of Ramsey Municipal Center. This will be an over-all evaluation <br />base~ on the panel's determination of ha well the proposer has met the system <br />design requir~nts and how well the proposer understands the present and <br />future needs of the operations at 15153 Nowthen Boulevard 1FW, Ramsey, <br /> <br />Reliability and Pepairability <br />The proposer must, to their best ability, support the reliability and <br />repairability of the equit~nent they intend to use in this proposal. <br /> <br />Completeness of Proposal <br />Tne panel wLll evaluate the proposals based on the completeness in all areas. <br />Tne proi~osal should sh~ careful consideration to the telephone needs of the <br />personnel at the P~msey Municipal Center and should include the ratior~le used <br />for designing ass, st~ that w~ll premote ~im~ efficiency in the operation <br /> <br />Page 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.