My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/16/2006
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2006
>
Agenda - Public Works Committee - 05/16/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 2:34:43 PM
Creation date
5/15/2006 8:02:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/16/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # 3 <br /> <br />CONSIDER CHANGE ORDER FOR IMPROVEMENT PROJECT 05-22 <br />RAMSEY TOWN CENTER PHASE 2 SEGMENT 1 <br /> By: Steven Jankowski, City Engineer <br /> <br />Background: <br /> <br />This project includes the construction of Civic Center Drive between Zeolite and <br />Sapphire Streets. One element of this street includes a "bump out" in the street section to <br />accommodate the bus loading zone in fi.ont of the municipal parking structure. Concrete <br />pavement is required through the area that busses will be braking and accelerating to <br />prevent rutting and shoving that would be anticipated if bituminous pavement were <br />utilized. The plans called for a 10 foot wide concrete bus parking section on the south <br />side of the street, but made an accommodation for only a five foot segment on the north <br />side. If constructed in this manner only the right side on the bus wheels would be braking <br />on concrete pavement. <br /> <br />In order to rectify this deficiency two options have been considered. The first option <br />would be to mill out the base course of bituminous pavement adjacent to the concrete and <br />place seven foot concrete section adjacent to the existing concrete curb. This would <br />provide a wide enough width to provide an adequate section for stopping buses. <br />However, this section would result in having a concrete section protruding into an <br />otherwise bituminous pavement on the north side of the street for a distance of <br />approximately 180 feet. On the south side of the street the concrete for the bus stop is <br />located entirely south of the extension of the curb line leading into the bus stop "bump <br />out". Although functional, there are aesthetic concerns with this alternative. A second <br />alternative would be to place a full width concrete section through a 250 foot section of <br />Civic Center Drive, by removing 37 feet of the bituminous base course and replacing it <br />entirely with a concrete section. <br /> <br />At the time of this writing staffis awaiting the receipt of costs fi.om the contractor to <br />facilitate both of these alternatives. <br /> <br />Recommendation: <br /> <br />To be presented at the meeting <br /> <br />Action: <br /> <br />Motion to recommend to City Council that a change order be authorized for one of the <br />alternatives described above. <br /> <br />Reviewed By: <br />Public Works Director/Principal Engineer <br />Fire Chief <br /> <br />PW: 05/16/06 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.