Laserfiche WebLink
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />April 7, 2023 <br />Mr. Bruce Westby, P.E. <br />City Engineer / Director of Public Works <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />RE: City of Ramsey - The COR Public Infrastructure Design Services <br />Dear Mr. Westby: <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton- Menk.com <br />We have prepared a scope of services and fee estimate for design services associated with public <br />infrastructure improvements in The COR. We understand the City is considering constructing the <br />following improvements: <br />• The Waterfront pond grading, lining, and related storm sewer improvements, <br />• Earthwork related to placing fill excavated from the Waterfront onto various lots located within <br />The COR. <br />• Zeolite Street from Sunwood Drive to Bunker Lake Boulevard, <br />• Center Street from 146th Avenue to Bunker Lake Boulevard, and <br />• Ramsey Parkway from Willemite Street to Sunwood Drive. <br />The initial concepts and strategies were detailed in The COR report update, completed in 2023. Our <br />proposal is based upon carrying these concepts and principles forward into the design phase. Each <br />street segment will include public utilities (sanitary sewer and water main), along with storm sewer, <br />trails, and sidewalks. The COR report included costs associated with street lighting, but those <br />improvements are not considered in this proposal as the work is assumed to be completed by the utility <br />company under a separate contract. <br />t3= kAENTA <br />The proposed improvements will provide several benefits to the area when completed. Understanding <br />these benefits will be important to ensure that City dollars are maximized. Generally, the final product <br />will provide the following benefits: <br />• Installed and functional City infrastructure within The COR, including, streets, sanitary sewer, <br />water main, storm sewer and pedestrian facilities, <br />• The construction of Ramsey Parkway will allow for completion of the east -west corridor through <br />the center of The COR, <br />C:\Users\kevinki\Desktop\COR Design 2023\New folder\Ramsey COR Area Design 04072023.docx <br />Bolton & Menk is an equal opportunity employer. <br />