My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/11/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 07/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:21:10 AM
Creation date
7/17/2023 4:04:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/11/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The majority of the drainage for the area west of Center Street currently flows north from Sunwood Drive <br />to the vacant parcels, wetlands, and depressions west of Center Street. The storm water then infiltrates or <br />flows overland to an outlet pipe near the Sunwood Drive and Yolite Street intersection. <br />The Veterans Drive and Peridot Street extension area currently drains to the existing wet pond located at <br />the southeast corner of The COR. The existing wet pond and infiltration basin are shown in Figures 6 and <br />7 in Appendix B. <br />Wetlands <br />In the fall of 2022, a wetland delineation was conducted within The COR Study area. Those findings are <br />still under review at the LRRWMO. Wetland delineations are depicted in Figures 6 and 7, and the full <br />delineation report is included in Appendix D. Mitigation will be required for a portion of the existing <br />wetlands if they are impacted by development. <br />VI. ROADWAY CLASSIFICATIONS AND DESIGN CONSIDERATIONS <br />This analysis includes examining the feasibility of constructing roadways and other supporting public <br />infrastructure in The COR. Roadways included in the study are as follows, see Appendix B: <br />• Ramsey Parkway — Willemite Street NW to Sunwood Drive NW, <br />• Center Street NW - from the existing developed section north to Bunker Lake Boulevard, <br />• Zeolite Street NW — from Sunwood Drive to Bunker Lake Boulevard, <br />• Yolite Street NW - Sunwood Drive to Ramsey Parkway, <br />• Veterans Drive NW - Rhinestone Street to Ramsey Boulevard, and <br />• Peridot Street NW - Sunwood Drive to Veterans Drive. <br />Street Hierarchy <br />The COR Design Framework plan establishes a street hierarchy designation for roadways within The <br />COR (see Appendix A). The 2040 Comprehensive Plan establishes road classifications to create a safe <br />and efficient roadway network throughout the City (see Appendix A). The following table presents a <br />summary of roadway classifications. <br />The COR <br />Street Segment From To Framework 2040 Comp Plan <br />Center Street Sunwood Drive Ramsey Parkway Downtown Local <br />Center Street Ramsey Parkway Bunker Lake Blvd Parkway Local <br />Ramsey Parkway Armstrong Blvd Ramsey Boulevard Parkway Local <br />Willemite Street Sunwood Drive Ramsey Parkway Downtown Local <br />Zeolite Street Sunwood Drive Bunker Lake Blvd Connector Local <br />Bunker Lake Blvd Armstrong Blvd Ramsey Boulevard Arterial A Minor Reliever <br />Prepared by: Bolton & Menk, Inc. ROADWAY CLASSIFICATIONS AND DESIGN CONSIDERATIONS <br />The COR Analysis I OR1.129128 Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.