Laserfiche WebLink
Veterans Drive Peridot Street <br />Improvement Setment H Segment I <br />Roadway $ 763,000 $ 360,000 <br />Trails/Sidewalks $ 254,000 $ 120,000 <br />Street Lighting $ 339,000 $ 159,000 <br />Storm Sewer $ 120,000 $ 41,000 <br />Watermain $ 245,000 $ 143,000 <br />Sanitary Sewer $ 0 $ 94,000 <br />Total Costs $ 1,721,000 $ 917,000 <br />Segments D-1, D-2, D-3 and D-4 include sidewalks and miscellaneous street scape improvements <br />along Sunwood Drive. The Segments, and associated costs, are presented in the following table. <br />Segment Location <br />D-1 <br />D-2 <br />D-3 <br />D-4 <br />Total <br />Center Street to Sapphire Street <br />Willemite Street to Center Street <br />Yolite Street to Willemite Street <br />Zeolite Street to Yolite Street <br />Estimated Cost <br />$ 134,000 <br />$ 201,000 <br />$ 230,000 <br />$ 237,000 <br />$ 802,000 <br />The above costs are considered project costs and include 30% contingencies and project development <br />costs. Project development costs include administrative, engineering, and fiscal related costs. <br />Summary of Costs <br />The total for the roadway, trail, sidewalk, and street lighting improvements is estimated at $8,794,000. <br />The total for sanitary sewer and water main extension improvements is estimated at $1,818,000. <br />The total trunk related improvements for sanitary sewer and storm sewer is estimated at $513,000. <br />The total landscaping improvements along Sunwood Drive from Zeolite Street to Sapphire Street is <br />estimated at $802,000. <br />The total for regional stormwater retention pond excavation, grading, and impervious liner is estimated at <br />$2,980,000. Tree removal and preservation associated with the regional pond area is estimated at <br />$160,000. <br />The total for mass site grading of the remaining undeveloped land within The COR, including wetland <br />mitigation is estimated at $3,002,000. Tree removal and preservation associated with the undeveloped <br />area is estimated at $794,000. <br />The total for The Waterfront, Phase 1 is estimated at $4,218,000. The Waterfront's park features are still <br />considered preliminary. Costs and improvements are based on 2018 City Cost Estimating effort, adjusted <br />for 2023 pricing and include a recreational splash pad, wading fountain, vehicle access, parking, <br />associated concrete walkways, a bituminous trail circumnavigating the stormwater feature, and <br />miscellaneous landscaping. The proposed community buildings, pergola, and future phases are not <br />included in these estimates. <br />Prepared by: Bolton & Menk, Inc. <br />The COR Analysis I OR1.129128 <br />COST ANALYSIS <br />Page 15 <br />