Laserfiche WebLink
Probable Construction Costs <br />Municipal Plaza - North <br />TOTAL <br />ESTIMATED <br />DIVISION DESCRIPTION QUANTITY <br />GENERAL REQUIREMENTS <br />EARTHWORK <br />MOBILIZATION (3%) 1 <br />COMMON EXCAVATION 2 281 <br />SLOPE PROTECTION 507 <br />SELECT GRANULAR BORROW AND ROUGH GRADING 2 281 <br />TOPSOIL BORROW AND ARCHITECTURAL GRADING 50 <br />CONCRETE WALKS AND STREET <br />FOUNTAINS <br />ARCHITECTURE <br />STAIRS AND WALLS <br />FENCE/SCREEN <br />CURB AND GUTTER <br />DETECTABLE CURB RAMPS <br />4" CONCRETE WALK <br />BITUMINOUS TRAILS <br />PERVIOUS PAVERS (INCL BASE) <br />BITUMINOUS WEAR COURSE (2") <br />BITUMINOUS NON -WEAR COURSE (2") <br />AGGREGATE BASE <br />DECORATIVE FENCE <br />UNITS <br />LUMP <br />CU YD <br />SQ YD <br />CU YD <br />CU YD <br />UNIT <br />COST <br />$ 27,900.00 <br />$ 20.00 <br />$ 8.50 <br />$ 25.00 <br />$ 30.00 <br />TOTAL <br />COST <br />, $ 27,900 <br />$ 27,900 <br />$ 108,467 <br />$ 45,626 <br />$ 4,309 <br />$ 57,032 <br />$ 1,500 <br />$ 444,559 <br />830 LF $ 18.00 $ 14,940 <br />4 EA $ 1,500.00 $ 6,000 <br />14 925 SF $ 6.00 $ 89,550 <br />LF $ 4.00 $ <br />2 050 SF $ 30.00 $ 61,500 <br />285 TON $ 100.00 $ 28,507 <br />285 TON $ 90.00 $ 25,657 <br />728 CY $ 22.00 $ 16,005 <br />$ 40,000 <br />400 LF $ 100.00 $ 40,000 <br />FURNISHING $ 61,200 <br />KIOSK (ARTFUL STRUCTURE, PARK SIGN AND INTERPRETIVE SIGN) 1 EA $ 15,000.00 $ 15,000 <br />RECEPTACLES 4 EA $ 1,500.00 $ 6,000 <br />BENCHES 4 EA $ 2,500.00 $ 10,000 <br />BIKE RACKS 2 EA $ 1,500.00 $ 3,000 <br />FIRE TABLE 2 EA $ 3,000.00 $ 6,000 <br />DRINKING FOUNTAIN 1 EA $ 5,000.00 $ 5,000 <br />PICNIC TABLES 5 EA $ 3,000.00 $ 15,000 <br />PLAY EQUIPMENT? EA $ 50,000.00 $ <br />TREE GRATE 1 EA $ 1,200.00 $ 1,200 <br />LIGHTING $ 55,800 <br />PEDESTRIAN POLE LIGHTS 31 EA $ 1,800.00 $ 55,800 <br />STORMWATER RE -USE AND TREATEMENT $ 195,500 <br />GENERAL PLANTING <br />UTILITIES <br />COLLECTION, CLEAN AND REUSE 0.9 ACRE $ 230,000.00 $ 195,500 <br />TREES <br />SM TREES <br />PLANTING SOIL <br />PERENNIALS/SHRUBS <br />NATIVE SEEDING W/ PLUGS <br />SOD <br />IRRIGATION <br />ALUMINUM EDGING <br />MULCH W FABRIC <br />STORM, WATER, POWER <br />$ 112,400 <br />35 EA 500.00 17,500.00 <br />31 EA 400.00 12,400.00 <br />730 CY 30.00 21,900.00 <br />2700 SF 8.00 21,600.00 <br />0.3 ACRE 5000.00 1,500.00 <br />650 SY 8.00 5,200.00 <br />19700 SF 1.00 19,700.00 <br />1200 LF 8.00 9,600.00 <br />300 SY 10.00 3,000.00 <br />$ 50,000 <br />1 LUMP $50,000.00 $ 50,000 <br />ESTIMATED CONSTRUCTION COSTS $ 1,095,826 <br />10% DESIGN CONTINGENCY 10% $ 109,600 <br />ESTIMATED CONSTRUCTION COSTS $ 1,205,426 <br />