Laserfiche WebLink
PERSONNEL COMPLEMENT <br />Public Works Superintendent <br />Secretary (Formerly under Engineering) <br />Mechanic <br />Street Supervisor <br />Streets Lead Worker <br />PW Maintenance Worker <br />Temporary - Streets <br />Street Maintenance Total <br />1.00 <br />1.00 <br />2.00 <br />1.00 <br />5.00 <br />0.50 <br />10.50 <br />1.00 <br />1.00 <br />2.00 <br />1.00 <br />5.00 <br />0.50 <br />10.50 <br />1.00 <br />1.00 <br />2.00 <br />1.00 <br />5.00 <br />0.50 <br />10.50 <br />1.00 <br />1.00 <br />2.00 <br />1.00 <br />1.00 <br />5.00 <br />0.50 <br />11.50 <br />1.00 <br />1.00 <br />2.00 <br />1.00 <br />1.00 <br />5.00 <br />0.50 <br />11.50 <br />1.00 <br />3.00 <br />1.00 <br />1.00 <br />8.00 <br />0.50 <br />14.50 <br />6488/6489 Other Contracted Services <br />Pavement Management Program Funding (Transfer to Pavement Management Fund) 260,742 300,000 <br />Contract services for Pothole patching <br />Cracksealing/Rejuvenation/Spray Patching 237,483 239,258 162,784 200,000 200,000 200,000 <br />Spray Patching 375,000 355,000 <br />Curb Repair/Tree Removal 15,000 15,000 20,000 <br />237,483 500,000 462,784 215,000 590,000 575,000 <br />6540 - Heavy Machinery <br />F350 truck with plow (2021 & 2022 total cost) <br />1-Ton Truck <br />2-Single Axls Plow Trucks 148,292 <br />Tractor Backhoe ($84,000 total remainder utility funded) 37,688 <br />Tandem Axle Truck with Plow <br />721 G Front End Loader <br />6550-Motor Vehicle <br />116,891 103,199 <br />298,750 <br />544,318 <br />185,980 <br />116,891 103,199 <br />298,750 544,318 <br />1-ton truck <br />2-3/4 ton trucks with plows (1 new & 1 replacement) <br />F550 4x4 Truck with 9' 2" V-plow (New) with lift gate <br />F350 4x4 with utility box and 9' 2" Boss V-Plow Sign truck <br />6580 - Other Equipment <br />62,772 <br />133,852 <br />62,772 133,852 <br />Sidewalk Machine <br />Snow Pusher Box for Front End Loader <br />Trailer for skidsteer <br />Toolcat <br />Skidsteer <br />162,723 <br />15,102 <br />36,105 <br />57,372 <br />Tire balancer (1/2 cost other 1/2 police) 9,453 <br />Asphalt floater 14,405 <br />ATV Athletic Field Maintenance Machine <br />Hydraulic hose Crimping Machine <br />Trailer Mounted Boom Lift <br />Bobcat T66 Skidsteer <br />Scissor Lift JLG 2646 <br />10-Foot Slide in Removable Salt/Sander Spreader (Truck Mounted) <br />Hydraulic hose Crimping Machine <br />14,032 <br />18,855 <br />14,032 <br />271,302 <br />23,858 18,855 <br />DESCRIPTION OF SERVICES: <br />The Street Maintenance Department is responsible for maintaining city streets, sidewalks, traffic signs, <br />boulevards, ROW mowing and the storm water collection system. <br />BUDGET HIGHLIGHTS <br />• COLA & Steps <br />• Spray Patching - ARPA funds of $375,000 spent in 2023 (6488-6489) <br />• 2-Single Axle Plow Trucks (CC Authorized 1-24-23) - $544,318 <br />GOALS OF CURRENT YEAR BUDGET: <br />Maintain and improve city's rating of 7.0 average of road condition <br />Increase use of contracted services on pothole repair (velocity patching) <br />Increase prevenative maintenace to prolong the life of our public streets <br />Maintain our city vehicles and equipment to the highest level possible <br />