Laserfiche WebLink
Capital Improvement Program <br />City of Ramsey, Minnesota <br />E <br />0 <br />H <br />19-SEW-003 <br />Useful Life <br />Sewer Utility Improvement <br />1-Existing Obligation (High) <br />Total Cost <br />U <br />CA <br />d) <br />a) <br />0) <br />V1 <br />0 <br />0) <br />z <br />—d <br />0 <br />0) <br />0 <br />ct <br />,44 <br />ct <br />0 <br />a) <br />0 <br />Justification <br />Both pumps will need to be replaced to assure proper pumping and reliability. <br />Replace both pumps and base elbows due to normal wear by 2023 <br />H <br />M <br />O <br />N <br />N <br />N <br />N <br />M <br />Expenditures <br />LC) <br />LC) <br />O <br />H <br />00 <br />N <br />N <br />N <br />N <br />Funding Sources <br />0 <br />LO <br />0 <br />0 <br />Lf) <br />Sewer Utility Fund <br />LC) <br />LC) <br />