My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/08/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 08/08/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:23:59 AM
Creation date
8/8/2023 12:11:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/08/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
787
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AND STAGING AREAS: Contractor shall confine their work activities within the right <br />of way at all times. No equipment shall be left on city streets outside normal working hours. <br />Equipment may be stored overnight on City owned property at 14210 Jaspar Street NW (unsecured <br />storage) or 14100 Jaspar Street NW (secured storage available) upon approval by the City. <br />TRAFFIC CONTROL: Contractor will be required to follow the most current edition of the <br />Temporary Traffic Control Zone Layout Manual. <br />SPECIFICATION REFERENCES: Contractor shall conduct all work in conformance with the <br />specifications set forth herein and in accordance with the most current edition of the Minnesota <br />Department of Transportation Standard Specifications for Construction, which is incorporated by <br />reference to these specifications. <br />PAYMENT: Final payment will be made upon submittal of final pay request to the City on a net <br />30-day basis following City acceptance of all work items included on the pay request. An IC 134 <br />form will be required prior to final payment. <br />BASIS OF PAYMENT: Payment shall be made for all components of the work as specified in <br />this RFQ. The cost of any additional equipment, labor, materials, permits, tools, and supplies <br />which have not been specifically identified in this RFQ for payment, but are required to complete <br />the work, shall be considered incidental to the project. <br />3 <br />RFQ — 2023 SPRAY PATCHING CONTRACTED SERVICES <br />STREET MAINTENANCE PROJECT #23-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.