Laserfiche WebLink
ZY <br />oz <br />JW <br />OE <br />ma}J <br />WETLAND MITIGATION COST <br />00 <br />W <br />oc <br />w <br />2023 THE COR PUBLIC INFRASTRUCTURE ANALYSIS <br />FEBRUARY 2023 <br />CITY OF RAMSEY, MINNESOTA <br />r <br />4 <br />2022 WETLAND DELINEATION LEGEND: <br />WETLAND MITIGATION REQUIRED <br />WETLAND IMPACTS INCIDENTAL <br />t 41 • <br />• <br />,E. <br />tp• <br />m <br />= <br />0 <br />cc <br />CD <br />AREAS DELINEATED IN 2022 THAT ARE CURRENTLY WCA REGULATED: <br />WETLAND 7: 0.38 AC <br />TOTAL = 4.48 AC <br />• , <br />REPLACEMENT RATIO=2:1 <br />• <br />• <br />cc <br />W <br />z <br />0 <br />Co <br />TOTAL WETLAND MITIGATION=8.96 AC <br />• <br />*ESTIMATED PROJECT COSTS INCLUDE PERMITTING AND ADMINISTRATION <br />pp, <br />41POIONI <br />• w s+r • • <br />if <br />/IP7.7 <br />t". <br />hjp <br />c/icir ..• <br />Ntr <br />1‘'t AL:7 <br />.v,, <br />(£8 HVSJ) GHVA11f1O9 DNOHLSWbV <br />0 <br />z <br />w � t <br />4.441 <br />16. <br />art • * F• <br />'t Lor <br />fi <br />WV 9T:£1:6 £ZOZ/6/Z Smp•spueIlam-8ZZ6ZZ-JSIW\a£J\GVJ\8ZZ6ZTT O\SWVH\:H <br />(14/1i,f, <br />,/S��ayd <br />bs <br />MN D H LS 2i31N]J <br />o 0- <br />00 <br /><J r110 <br />Ibt,t <br />0 , <br />tst • <br />441 <br />