My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/08/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 08/08/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 11:47:27 AM
Creation date
8/8/2023 12:11:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/08/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
787
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 (1) Permit required. A permit must be obtained from the zoning administrator prior to conducting <br />2 the following activities: <br />3 a. The erection, addition, modification, rehabilitation, or alteration of any building, <br />4 structure, or portion thereof. Normal maintenance and repair also requires a permit if <br />5 such work, separately or in conjunction with other planned work, constitutes a <br />6 substantial improvement as defined in section 105. <br />7 b. The use or change of use of a building, structure, or land. <br />8 c. The construction of a dam, fence, or on -site septic system. A farm fence would require <br />9 a zoning permit but is not considered a structure when administering this subdivision. <br />10 d. The change or extension of a nonconforming use. <br />11 e. The repair of a structure that has been damaged by flood, fire, tornado, or any other <br />12 source. <br />13 f. The placement of fill, excavation of materials, or the storage of materials or equipment <br />14 within the floodplain. <br />15 g. Relocation or alteration of a watercourse, including new or replacement culverts and <br />16 bridges), unless a public waters work permit has been applied for. <br />17 (2) Application for permit. Permit applications must be submitted to the zoning administrator on <br />18 forms provided by the zoning administrator. The permit application must include the <br />19 following as applicable: <br />20 a. A scaled site plan showing all pertinent dimensions, existing or proposed buildings, <br />21 structures, and significant natural features having an influence on the permit. <br />22 b. Location of fill or storage of materials in relation to the stream channel. <br />23 c. Copies of any required municipal, county, state or federal permits or approvals. <br />24 d. Other relevant information requested by the zoning administrator as necessary to <br />25 properly evaluate the permit application. <br />26 (3) Certificate of zoning compliance for a new, altered, or nonconforming use. No building, land <br />27 or structure may be occupied or used in any manner until a certificate of zoning compliance <br />28 has been issued by the zoning administrator stating that the use of the building or land <br />29 conforms to the requirements of this subdivision. <br />30 (4) Certification. The applicant is required to submit certification by a registered professional <br />31 engineer, registered architect, or registered land surveyor that the finished fill and building <br />32 elevations were accomplished in compliance with the provisions of this subdivision. <br />33 Floodproofing measures must be certified by a registered professional engineer or registered <br />34 architect. <br />35 (5) Record of first floor elevation. The zoning administrator must maintain a record of the <br />36 elevation of the lowest floor (including basement) of all new structures and alterations or <br />37 additions to existing structures in the floodplain. The zoning administrator must also maintain <br />38 a record of the elevation to which structures and alterations or additions to structures are <br />39 floodproofed. <br />40 (6) Notifications for watercourse alterations. Before authorizing any alteration or relocation of a <br />41 river or stream, the zoning administrator must notify adjacent communities. If the applicant <br />42 has applied for a permit to work in public waters pursuant to Minn. Stats. § 103G.245, this <br />43 will suffice as adequate notice. A copy of the notification must also be submitted to the <br />44 Chicago Regional Office of FEMA. <br />45 (7) Notification to FEMA when physical changes increase or decrease base flood elevations. As <br />46 soon as is practicable, but not later than six months after the date such supporting <br />47 information becomes available, the zoning administrator must notify the Chicago Regional <br />48 Office of FEMA of the changes by submitting a copy of the relevant technical or scientific data. <br />49 (C) Variances. <br />Page 127 of 160 <br />
The URL can be used to link to this page
Your browser does not support the video tag.