Laserfiche WebLink
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />August 9, 2023 <br />Joe Feriancek, P.E. <br />Assistant City Engineer <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />RE: Proposal for Construction Staking Services, Central Park Parking Lot Reconstruction (CP No. 23-02) <br />Dear Mr. Feriancek: <br />We appreciate the opportunity to assist the City of Ramsey with construction staking for the above <br />referenced project. Our scope of work will include the following: <br />• Check and Re-establish Horizontal and Vertical Control, <br />• Create Stakeout Files, <br />• Stake Silt Fence, <br />• Stake Tree Protection Fence, <br />• Stake Storm Sewer/Conduit and structures, <br />• Stake Concrete Sidewalk, <br />• Set Bluetops at Subgrade and subbase, <br />• Stake Final Curb, and <br />• Complete As -built Survey for Record Drawing <br />Bolton & Menk proposes to perform the staking based on a not -to -exceed amount, based on the rates <br />presented in the following table: <br />Task and Personnel Hours Rate/Hour Total <br />Task 1: Construction Staking <br />Licensed Surveyor <br />Survey Technician <br />Survey Crew <br />5.0 <br />10.0 <br />52.0 <br />$183.00 <br />$160.00 <br />$181.00 <br />$ 915.00 <br />$ 1,600.00 <br />$ 9,412.00 <br />Subtotals 67.0 - $11,927.00 <br />If an as -built survey is not required, the above amount can be reduced by $2,330.00. If there are any <br />questions, please call me at (651) 968-7760. <br />Sincerely, <br />BOLTON & MENK, INC. <br />Kevin P. Kielb, P.E. <br />Principal Engineer <br />Bolton & Menk is an equal opportunity employer. <br />