Laserfiche WebLink
2023 Neighborhood Pavemet Overlay Improvements <br />LP. 23-07 <br />Estimate No. 2 Partial <br />Period Ending July 31, 2023 <br />Item No. MnDOT <br />No. <br />CONTRACT AMOUNT <br />COMPLETED THIS PERIOD COMPLETED TO DATE <br />1 2021.501 <br />2 2194.603 <br />2104.503 <br />21 04.503 <br />21 04,504 <br />Item Description <br />MOBILIZATION <br />REMOVE CONCRETE CURB AND GUTTER <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />SAWING CONCRETE 1FUL1. DEPTH) <br />REMOVE BITUMINOUS PAVEMENT <br />Unit Estimated <br />LS <br />LF <br />Quantity <br />1.0 <br />514 <br />Unit Price <br />$ 17,470.77 <br />$ 8.27 <br />LF 702 S 2,52 <br />LF 261 $ 5.73 <br />Extended Total quantity <br />Extended Total Quantity <br />$ 17,470.77 0.0 $ <br />$ 4,250.78 0 <br />$ 1,769,04 0 $ <br />S 1,495.53 0 <br />1 <br />399 <br />425 <br />6 2104.504 <br />7 2211.507 <br />8• 2231,603 <br />9 2231,604 <br />10 2232.504 <br />11 2232,504 <br />12 2301.604 <br />13 2357.506 <br />14 2360.509 <br />15 2360.509 <br />16 2503.602 <br />17 <br />18 <br />19 <br />20 <br />2503.602 <br />2504,602 <br />2506.502 <br />REMOVE CONCRETE WALK <br />AGGREGATE BASE CLASS 5 MODIFIED (CV) <br />SAWED & SEALED JOINT <br />BITUMINOUS PATCH <br />MILL BITUMINOUS SURFACE (1,0") <br />MILL BITUMINOUS SURFACE (2,0") <br />CONCRETE PAVEMENT DRIVEWAYS 6" <br />BITUMINOUS MATERIAL FOR TACK COAT <br />TYPESP 9.5 WEARING COURSE MIXTURE (3,C)1.5" <br />TYPE SP 9,5 WEARING COURSE MIXTURE (3,C) 2,0" <br />GROUTCATCH BASIN • <br />RESET' CATCH BASIN <br />ADJUST VALVE BOX <br />SY <br />SY <br />CY <br />EA <br />SY <br />SY <br />SY <br />SY <br />143 $ 8,81 <br />186 $ 9,06 <br />9 $ 43.91 <br />130 S 48.23 <br />333 <br />3023 <br />33377 <br />48.33 <br />2,64 <br />1.04 <br />8 S 80.39 <br />3 973.83 0 $ <br />$ 1,685.16 0 $ <br />$ 4,215,36 0 S <br />$ 6,269,90 0 $ <br />S 16.093.89 0 $ <br />$ 7,9130.72 0 <br />$ 34,712,08 0 <br />$ 643.12 0 <br />85 <br />Extended Total <br />$ 17,470.77 <br />3,299.73 <br />1,071.00 <br />167 <br />186 <br />15 <br />205 <br />196 <br />3066 <br />33377 <br />GAL 2546 <br />TON 250 <br />TON 3772 <br />• EA 63 <br />EA 2 <br />2.84 <br />80.16 <br />84,94 <br />91.11 <br />321,55 <br />ADJUST FRAME AND RING CASTING <br />6" CONCRETE WALK <br />21 <br />22 <br />DRILL & GROUT REINF BAR (EPDXY COATED) <br />CONCRETE CURB & GUTTER DESIGN B018 <br />EA 18 <br />EA 28 <br />SY 324 <br />$ 7,230.64 0 <br />$ 22,568,96 0 <br />$ 320,393.68 0 <br />$ ' 5,739.93 0 <br />5 <br />$ 643.10 0 $ <br />107.18 $ 1,929.24 0 $ <br />S 53.59 $ 1,500.52 <br />0 $ <br />0 <br />487.05 <br />1,137.27 <br />1.685.16 <br />658.65 <br />5 9,887,15 <br />9,472.68 <br />$ 8,094,24 <br />S 34,712,08 <br />2190 <br />253 <br />3314 <br />$ 69.67 $ 22,573.08 0 $ <br />A 222 $ 10.72 $ <br />374 $ 48.23 S <br />2,379.84 0 <br />18,038.02 0 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />(Lem No, MnDOT <br />Na. <br />CONCRETE CURB & GUTTER DESIGN SURMOUNTABLE <br />7" CONCRETE VALLEY GUTTER <br />TRUNCATED DOMES <br />LANDSCAPE RESTORATION <br />TRAFFIC CONTROL <br />TOPSOIL (LV) <br />SODDING TYPE LAWN <br />LF <br />ORIGINAL CONTRACT TOTALS <br />Item Description <br />30A 2232.504 MILL BITUMINOUS SURFACE (1,5") - ALPINE DRIVE <br />13A 2357.506 BITUMINOUS MATERIAL FOR TACK COAT - ALPINE DRIVE <br />14A 2360,509 TYPESP 9,5 WEARING COURSE MIXTURE (3,C) i,5"- <br />ALPINE DRIVE <br />140 $ 48,23 $ 0,752,20 0 <br />SY 17 <br />5F 370 <br />L5 1 <br />LS 1 $ 3,215.48 $ 3,215,48 0 <br />6,219,60 <br />22,304.40 <br />2131,491.16 <br />7 $ 637.77 <br />0 <br />3 <br />321.54 <br />7 S 375,13 <br />353 <br />378 <br />399 <br />0 <br />3 24,593.51 <br />4,052,18 <br />$ 19,243.77 <br />$ <br />75.03 5 1,275.51 0 <br />48.23 3 17,045.10 0 <br />CY 2 <br />SY <br />1,607,74 $ 1,607,74 0 <br />49.84 S 1,048.64 " 0 <br />$ <br />$ <br />$ <br />12 <br />378 <br />189 $ 24.27 5 4,587.03 <br />$ 530,806,89 <br />CHANGE ORDER No.1 - REVISE ALPINE DRIVE MILL & OVERLAY <br />Estimated Unit Price <br />Quantity <br />Unit <br />SY <br />GAL <br />5870 $ 2.64 <br />411 $ 2.84 <br />Extended Total <br />$ '15 5 �4 <br />$ 1,167.24. <br />TON <br />498 <br />88.16 <br />$ 43,903,68 <br />CHANGE ORDER TOTALS <br />$ 60,583.56 <br />350 <br />Quantity <br />0 $ <br />1 <br />1 <br />31 <br />$ 8,494.50 350 <br />8,404.50 <br />900.38 <br />18,230,94 <br />1,607.74 <br />5 3,215.48 <br />1,545.04 <br />8.494.50 <br />481,208.96 <br />Extended Total Quantity Extended Total <br />0 <br />0 <br />5 <br />5 <br />7532 $ 19,884.48 <br />5 2,138.52 <br />753 <br />621 <br />$ <br />GRAND TOTALS <br />$ 697,470.46 <br />$ 8,494,60 <br />54,747.38 <br />70,770.30 <br />557,979.32, <br />Infernal City Use Only <br />Pavement Management Fends <br />Stvm1 Sewer Utility Funds • .•; _ :=.•.t-.. <br />2023 Budgeted Temporary Pavement R pairFvnds : r: _.: �.-::•; <br />Total Funds <br />• <br />.$ 480,571.19 <br />• 037.77 <br />$ 76,770.36 <br />$ , 557,979,32 <br />Pay Estimate Page 2 of 2 <br />