Laserfiche WebLink
5. 12. <br />CC Regular Session <br />Meeting Date: <br />08/22/2023 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Information <br />Title <br />Adopt Resolution #23-189 Approving Change Order #1 for Barthel's Rum River Acres 2nd Street <br />Reconstructions, Improvement Project #23-05 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #23-189 approving Change Order #1 for Barthel's Rum River <br />Acres 2nd Street Reconstructions, Improvement Project #23-05. <br />Background: <br />During project construction City Staff was made aware of a drainage issue in the front and side yards of 5664 and <br />5720 164h Avenue NW. The shared swale between the two properties has at some point filled, no longer allowing <br />storm water runoff to flow south to the existing low area within drainage & utility easements as intended with the <br />original subdivision plat and grading. Because of this water backs up in the front yard of 5664 164th Avenue NW. <br />As part of Improvement Project #23-05 subsoil correction and drain tile is being installed. Because the drain tile <br />can potentially carry storm water runoff to this area quicker, the potential for a larger impact from storm water <br />backing up outside of the drainage & utility easement areas exist. <br />With this change order the drainage swale will be re -graded back to original designs, carrying the storm water <br />runoff to the existing low area with drainage and utility easements and preventing it from backing up in the front <br />yard of 5664 164th Avenue NW. <br />Revised plan sheets and estimate for the change order is attached to this case. <br />Notification: <br />If Council approves Change Order #1, Staff will notify the residents impacted by Change Order #1 with updates <br />on the project status. <br />Observations/Alternatives: <br />Alternatives: <br />Motion to adopt Resolution #23-189 approving Change Order #1 for Barthel's Rum River Acres 2nd Street <br />Reconstructions, Improvement Project #23-05. <br />Funding Source: <br />Funding for Change Order #1 is proposed to come from Stormwater Utility Funds. Change Order #1 increases the <br />estimated construction costs by $18,490.45 . An estimate for Change Order #1 is attached to this case. <br />Recommendation: <br />