Laserfiche WebLink
CHANGE ORDER NO 1 <br />Date: August 10, 2023 <br />Project: Barthels Rum River Acres 2nd Reconstruction <br />City Improvement Project #23-05 <br />Contractor: Douglas -Kerr Underground <br />Award Date: May 24, 2023 <br />Contract Modifications: <br />Add Quantity, Remove Culvert; <br />23 LF @ $8.25 per LF = $189.75 <br />Add Quantity, Sawing Bituminous Pavement - Full Depth; <br />12 LF @ $2.80 per LF = $33.60 <br />Add Quantity, Remove Bituminous Pavement - Driveways; <br />24 SY @ $8.25 per SY = $198.00 <br />Add Quantity, Common Excavation (EV); <br />168 CY @ $19,35 per CY = $3,250,80 <br />Add Quantity, 15" RC Pipe Sewer Design 3006 Class III; <br />16 LF @ $97.80 per LF = $1,564.80 <br />Add Quantity, 15" RC Pipe Apron; <br />2 EA @ $2,381,00 per EA = $4,762.00 <br />Add Quantity, Rolled Erosion Prevention Category 20; <br />28 SY @ $1.50 per SY = $57.00 <br />Add Quantity, Sediment Control Log Type Straw; <br />205 LF @ $3.00 per LF = $615.00 <br />Add Quantity, Topsoil (LV); <br />87 CY @ $37.10 per CY = $3,227.70 <br />Add Quantity, Seeding; <br />0.13 ACRE @ $1,500 per ACRE = $195.00 <br />Add Quantity, Hydraulic Mulch Matrix; <br />500 LBS $1.20 per LB = $600.00 <br />Add Quantity, Seed Mixture 25-151; <br />15 LBS @ $3.20 per LB = $48.00 <br />